Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD01-158
Wemrmm & ICslzBuildi~ 181 Quinry 3Uee[, Swte 301 Pmt Towreend, WA 98368 PMtm: (360)3793206 Faz: (360)3857675 w CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-1S8 Issued: 9127/01 Parcel Number: 001 041 003 Job Address: 2220 35'" Street Zoning: RR=II Type: VV=N Total Occupant Load: 2 Occupancy: R-3 Nature of Work: Construct Sinele family residence Owner: Joshua & Erin Saee Contractor: Same as Owner ****All elements of engineering including holdowns, anchor bolts, framing, nailing and other engineered connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks / ~/ (0/0 ~~ Footings Forms Reinforcement Interior Footings E ~~ Call 48 hours before you dig for utility line locates • I-800-424-5555 Page 1 of 4 Pmnit#HL-01•I58 REQUIRED INSPECTIONS APPRnVF.TI/nATF FOUNDATION -revised engineering based on feral location of ~ window and door openings to be submitted and approved prior to foundation inspection n / ~~~~~/~ ~ l:l Stem Wall ` / Forms Reinforcement Anchor Bolts & Washers - %s "x 10" @ 3' o.c. @SW3; 6' o.c. Engineered Holdowns - STHDIO @SW3 Vents - 3 required Crawl Access SLAB R-10 under n n r f/ !D/?.p1Q/ ( _ Radiant Floor Tubing [ ~ bbl FLOOR FRAMING NOTE: Engineered BCI floor joist plan to be on-site at time of Inspection I~/ q 5Io I Joists /~ Radiant Heat Tubing Blocking Positive Connections Treated Wood to Concrete Anchor Bolts and Washers Foundation Vents PLUMBING: Rough-In (D-V-T & Clean outs) 2 ~ ~ /O~ ('~ `~ Water Supply ~ 11 J I Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Boiler -installation instructions shall be on-site at / /1~ 7j1 /~~~i (/~ time of inspectton `( "~( Whole House Fan Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page2of4 Pamil#BLDOId58 RRnTTTRF,n TNSPF.CTIONS APPROVED/DATE FRAMING: Walls -engineered panel walls Treated Wood to Concrete 2 /~/©y ~0 / (/ J Engineered Posts, Beams & Headers / Ceiling/Roof -per engineered panel system Roof Positive Connection Roof Venting -where applicable Windows -escape Windows -safety glazing Windows U-factor -varies; refer to WATTSUN NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Wall or Wall Ports required) Doors U-factor - .42 & .47 (or better) per attached WATTSUN Fire Blocking Weather Resistive Battier INSULATION Floor - (R-19 required) ` ~ ~~J ; fJ ~~ t`~~i Walls - (R-19; ok per wall panels) Ceiling - (R-30; ok per roof panels) Baffles (if applicable) Vapor Barrier required: VB paint, faced balls, etc. 6 mil black poly in crawl space DRY WALL NAILING Walls Ceiling FINAL -Labor and Industries Electrical Final Inspection required for all other buildings on property prior to occupancy Public Works Sign-Off House Numbers - 5" LPG Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building ~~~~,. ~ ~` /~`, Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit#BLI]01-158 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection an your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-~ residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the Feld. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4