HomeMy WebLinkAboutBLD01-155Watemwn & Katz
181 Wino' Street Suite 301
Pal Tow~uend, WA 98368
Phone (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT &
RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
C~
Permit Number: BLDG 1-155
Job Address: 1807 Kuhn Street
Total Occupant Load: No Chance
Owner: Steve Heemstra
Issued: 7/10101 ,Parcel Number: 948302305
Zoning: R-II Type: V_N Occupancy: R-3
Nature of Work: Construct deck (216 sa. ft.)
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks
Deck Pier Footings
Reinforcement ~ a~ ~~~ ~o ~~
pU /""""-" -_
M
~~/Q j `/-'~/
FLOOR FRAMING/DECK
All framing members to be pressure treated or wood of
natural resistance to decay
Posts
Beam
Joists (2" x 8")
Positive Connection
Post-to-Pier
Post-to-Beam
Treated Wood to Concrete
Lag Bolts @ ledger
Blocking
FINAL
House Numbers posted (minimum 5'~
Guardrails
Handrails
Stairs
Smoke Detectors throughout existing construction per 1997
UBC
Deck -Final
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
Permit#BLD01-ISS
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details).. Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible Tor protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-~
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2