HomeMy WebLinkAboutBLD01-152Waterman & Katz Building
1 BI Quincy Stteeq Suite 301
Pon Townsend, W A 98368
Phone: (360)379-3208 Pnx: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOl-1S2R-1 Issued: 8/30/01 Parcel Number: 989700611
Job Address: 639 Water Street Zoning: CIII Type: VV=N Occupancy: A-3
Total Occupant Load: 416 Nature of Work: Revision #1: build stockroom at north end of mezzanine:
install one-hour doors to mezzanine and main floor stockroom. Square footage of eatin¢/drinkin¢ space is
less than 5 000 square feet (4 937 square feet) and mezzanine is less than 1,500 square feet (1385 square feet)
so fire sprinkler system is not required by code.
Owner: Water Street Coraoration Contractor: Same as Owner
379-6438; 385-5467
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries C~ 360-417-2702
• See original permit BLDOl-152 for other inspections.
RFt'liTiRFiI l'NCPF.C TiC)NS
APPROVED/DATE
FRAMING -Barrier free door approach clearances
required. /
q / ~~
Walls Gl/
Ceiling
Blocking
Positive connections
Thresholds - Yz" maximum
I -Hour Doors with lever hardware
DRYWALL NAILING -One-hour Occupancy /
Separation Required. 9 /`/~l
Walls
Ceiling
FINAL
Final -Building -See original inspection record.
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemrit tt BLD01-152R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept Free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections..
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Pu61ic Works
requirements have been completed and inspected. For Public Works inspection ca11 3 8 5-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate. of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the £eld. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERNHT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
watefman a Katz ewta~
161 Quivry Street, Sui4301
Port Towreend. WA 98368
Phone: (360)379-3208 Fa:(360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-1S2 Issued: 8/09/Ol Parcel Number: 989700611
Job Address: 639 Water Street Zoning: CIII Type: VV=N Occupancy: A-3
Total Occupant Load: 416 Nature of Work: TI• Exuand Maxwell's Restaurant into existine Town Tavern
Owner: Water Street Coraoration
Contractor: Same as Owner
379-6438; 385-5467
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Fire Sprinkler System
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: -See also attached Fire Department Memo dated 8/08/01
-HPC Review required prior to making exterior changes in the f eld
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All materials shall be disposed of in areas off-site meeting
the requirements of state and local law
FRAMING
Walls
Ceiling
Posts
Beams
Joists
Blocking
Positive connections
Guardrails
Handrails
Thresholds
Windows: U-factor of .90 or better
Air Sea!
Draft Stops
Ca1148 hours before you dig Tor utility line locates
1-800-424-5555
Page 1 of 3
Pamitk BIDOI-152 a
REQUIRED INSPECTIONS APPRnVF,n/DATF.
PLUMBING - Bamer--Free Required
Drain, Waste & Vent
Water Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80psi
Water Heater
Pressure Relief Valve Drain to exterior
Seismic Straps
MECHANICAL
LPG
Exhaust Fans -ducting (with backdraft dampers), insulation
(R-3) and termination (3' from openings into building)
DRYWALL NAILING
Walls
Ceiling
FINAL
Fire Department Approval
Health Department Approval
State Electrical Approval
Doors -'/2" thresholds and lever hardwaze
Guardrail
Stairs w/handrail (each side if wider than 44")
100# LL required for. stairs
Handrail extensions: 12" @ top, 24" @ bottom
Plumbing -Barrier Free
Mechanicai
Exit Signage
Exit Illumination
/
Final -Barrier Free Design D~~~
Final -Building
GENERAL CONDTTIONS
1. CoirtraMors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut dawn while this is accomplished.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Pemtit k BLDOI-152
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11 385-2 294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
S. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3