Loading...
HomeMy WebLinkAboutBLD01-151City of PoA Townsend Waterman & Katz Building 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone 379-3208 Faz 385-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 38 5-22 9 4 for Inspection Permit Number: I3LD01-151R-1 Issued: 10/05/01 Parcel Number. 993-800-017 Job Address: 2456 Seaview Estates Zoning: R-I "Type: VV=N Occupancy: RR=3 Occupant Load: No chance Nature of Work: Revision #1: See attached WATTSUN for energy budget compliance. Owner: Kurt & Patricia Lamberton Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Note; see original permit BLDOl-151 for other inspections. RF.OiJiRED INSPECTIONS APPROVED/DATE FRAMING -See attached WATTSUN Windows Ufactor - .29 or better; Low E & Argon NFRC window sticker must be on windows & doors at inspection time Doors Ufactor - .39 or better INSULATION -See attached WATTSUN Floor (R-19) vented joist 16" o.c. Wall (R-19) STD T1-11 Ceiling -sloped ceiling with T&G and 3-I/2" Thermax rigid insulation. FINAL See original building permit Colt 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Building Permit #Old31R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's reeistration numbe~ and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; cal1385-2294. Measures shalt include installation of si{t fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; aminimum oftwenty-four hours notice is required. Public iVorks approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval arior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Y City of Port Tow~mend Watertnan & Katz Building 181 Quincy Stnxl Suite 301 PoA Townsend, WA 98368 Phone 379-3208 Faz 385-7673 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 8 5-2 2 94 for Inspection Permit Number: BLDO1-181 Issued: 07/18/01 Parcel Number: 993-800-017 Job Address; 2456 Seaview Estates Zoning: R-I Type: VV=N Occupancy: RR=3 Occupant Load: 212 Nature of Work: SFR Addition with attached earaee Owner: Kurt & Patricia Lamberton Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUII2ED: Electrical -Contact Labor & Industries @ 360-417-2702 RF(~TITRF.T) TNfiPF.('TT(~NS APPRnVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat per attached details FOOTINGS Setbacks - S' minimum from side property line , 712 Tf ~ ~ Footings Forms Reinforcement Interior Footings Deck Piers UFER FOUNDATION Stem Wall ~/Z~~®~ Forms Reinforcement Anchor Bolts Vents Crawl Access Engineered Holdowns Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Building Panut #OS-] 51 REQUIRED INSPECTIONS APPROVF,D/DATF. MONOLITHIC SLAB Anchor Bolts & Washers Engineered Holdowns FLOOR FRAMING Engineered BCI plan to be on-site @ time of inspection „^ j 1 ( ( ) Joists ~ ~~ ~ ~ ~ l ( l Blocking I Shield under Posts Positive Connection Treated Wood to Concrete Engineered Straps - CMST 14 PLUMBING: Rough-In (D-V-T & Clean Outs) Water Supply ~OI (~ ~~ Gas Supply Water Hammer Arrestor @ clothes & dishwasher ' s ackflow rotection. required) P' nsu - R-3 ressure REduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, tenninate 6" - 24" above groun L Whole Hou entilation Source Specific Fans Environmental Air Exhaust ducting (with r'd/~~~0~ backdraft damper), insulation (R-4) and terminus (located 3' from opening) Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 2 of 4 Building Pemtit #O1-151 REQUIRED INSPECTIONS APPROVED/DATE FRAMING Walls Engineered Shear Walls ~~~~~~~~ Engineered Headers, Beams and Posts Roof Attic Venting Ceilings Windows -egress Windows -safety glazing Windows Ufactor - .25 or better NFRCwindow sticker must be on windows & doors at inspection time Fresh Air Intake -window or wall ports if not existing Air Seal Doors Ufactor - .40 or better Rafter Positive Connection Fire Blocking Weather Resistive Barrier INSULATION Floor (R-25) ~ ~ _" `/ ~ ,~~~~ ~% ~ Wall (R-19) Ceiling (R-30) Baffles ~ /~ ~~ ~/`~B1 /.1~ ~'(/ (~ Vapor Barrier required e.g., faced balls, V. B. paint, etc. DRY WALL NAILING Walls //Z ~D/ Ceiling Usable Space under Stairs House/garage Occupancy Separation FINAL LPG House Number - 5"numbers Plumbing Mechanical Insulation Certificate V. B. Paint Certificate Smoke Detectors -verify throughout existing and new construction // Final -Building ~~~~ 'h/ G Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page 3 of 4 Building Pemtit fW I-151 GENERAL CONDITIONS 1. ContraMors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is tesponsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least ape inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4