Loading...
HomeMy WebLinkAboutBLD01-149watem,an ~ xaz~s~iaug 1 B7 Quinry Sveet, Swte 301 Port Townsen4 WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND ` CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO~-149R-I Issued: 09/04/01 Parcel Number: 001 021022 Job Address: 952 Walkine Place Zoning: RR=II Type: VV=N Occupancy: U-1 Nature of Work: Construct 888 sg. ft. earaee accessory to sine le-family residence (BLDOI-149). Owners: Glen and PeQav Stalev Contractor: Rose. Inc. (Phil Johnson 385-1570) GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See Genera[ Condition No 2 FOOTING Setbacks Footing Forms Reinforcement LIFER FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts with 2"x 2" x 3/16" washers FRAMING Engineered truss plan to be on-site at time of inspection Walls Treated Wood to Concrete Anchor Bolts Ceiling/Roof Truss Positive Connection Weather Resistive Barrier FINAL Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pmnit M HLD149R-I GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching,plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within ane year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & Katz BuiWing 181 Quinry Streeq Buile 301 Porl Townsend, WA 98368 Phone 360-379J208 Fax 360J85-7675 • • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-149 Issued: 09/04/01 Parcel Number: 001 021 022 Job Address: 952 Walking Place Zoning: RR=II Type: V,=N Occupancy: R-3 (see R-1 for detached garage) Total Occupant Load: 9 Nature of Work: Single-family Dwelling (see R-1 for detached era e Owner: Glen & Peggv Stalev Contractor: Rose. Inc. ,Phil Johnson 385-1570 GENERAL CONDITIONS APPLY: See last sage SEPARATE PERMITS REQUHtED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 & attached Street and Development Permit Silt Fencing Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement Interior Footings -per engineering Porch Piers UFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 ~_ a Building Pmn¢ #01.149 REQUIRED INSPECTIONS FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers -per shear wadi schedule Engineered Holdowns Vents - ]8 required Crawl Access Beam Pockets FLOOR FRAMING Girders Joists -engineered BCI plan on site at inspection time Hydronic Tubing Blocking Positive Connection Girder to Concrete Treated Wood to Concrete Anchor Bolts & Washers -per shear wall schedule PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestor @ clothes and dishwasher Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL LPG Boiler/water heater Hydronic in-floor heating Whole house ventilation Whole house fan Window or Wall ports required Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (l00 cfin) and utility room (50 cfrn) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) APPRnVF.n/i)ATF .~ • Call 48 hours before you dig for utility line locates I-800.424-5555 Page 2 of 4 <, ,, - Building Pmnit #01-149 S ~ RE UIRED INSPECTIONS APPROVED/DATE C~ i L J FRAMING Walls Engineered Shear Walls Ceiling Joists Roof -engineered truss plan on site @ inspection time Positive connection Blocking Attic venting - eave and ridge vents Posts, beams and headers -per engineering Windows -escape Windows -safety glazing Window U-factor - .75 or better NFRC sticker must be on windows at time of inspection Doors - .40 or better Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor (R-19 ) Walls (R-19 ) Ceiling (R-30 ) Baffles Vapor Barrier -vapor barrier paint DRYWALL NAILING Walls Ceiling Enclosed Usable Space under Stairs FINAL Public Works Sign-off LPG House Numbers - S " mrmbers minimum Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 > ~ ". Building Pe'mil q0l-149 ^t. GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business lieense. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-oT way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unabte to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum. of twenty-four hours notice is reauired. Public Works approval 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call Tor at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 4 of 4