Loading...
HomeMy WebLinkAboutBLD01-150 u City of Port Tow~ee~d Waterman & Katz Building .181 Quincy Street, PortTownsn~d, WA 98368 (360) 379.3208 Faz (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-ISO Issued: 07/19/01 Parcel Number: 973200201 Job Address: 3541 McNeill Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Occupant Load: 5/4 Nature of Work: New house with unfinished basement & attached eara2e Owner: Gaee and Erin Little Contractor: Little & Little Construction ~~'~~ 1 ~'~~~ ~ j~rfdv GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE EROSION CONTROL See General Condition #2 Sweeping of paved surfaces may be required to eliminate the tracking of dirt and debris onto City rights-of--way FOOTINGS Setbacks ~~~~~ Footings / Forms Reinforcement Interior Footings -per veering FOUNDATION Stem Wall ~~~ ~n ~'/ ~/0~ (={/ Forms Reinforcement Anchor Bolts -per shear wall schedule Engineered Holdowns Waterproofing Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Building PertnO NBLDOI-ISO RE UIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING BCI joist plan shall be. on-site at time of inspection Joists /7/iIS1 Z ~// ll/ ~~// ~ Blocking !((!! - Shieldunder Posts Positive Connection Post-to-Beam Positive Connection Post-to-Pier Treated Wood to Concrete Anchor Boits & Washers - per shear wall schedule PLUMBING Rough-In (D-V-T & Clean Outs) Water Supply Water Hammer Arrestor @ Clothes & Dishwasher Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 pad under Seismic Restraints Pressure Relief Valve Drain to exterior; terminate 6"-24" above grade MECHANICAL Source Specific Fans Whole House Fan -Floor-2 bath Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from openings) • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Permit NBLD01-150 • REQUIRED INSPECTIONS APPROVED/DATE FRAMING: Walls Engineered Shear Walls ~-,1 ,,, //~!//~fi Attic Venting -ridge & soffit l Ceilings Roof -engineered truss plan to be on-site at time of inspection Posts, Beams and Headers Windows Ufactor - .37 or better per WATTSUN NFRC window sticker must be on windows & doors at inspection time Air Seal Fresh Air. window port Door UFactor - .19 or better Truss Positive Connection Fire Blocking ,/ Z Weather Resistive Barrier Q ~ 7i ~ INSULATION Wall(R-19) J Floor (R-30 / N ~ ~~/ G Ceiling (R-30 vault/R-38 attic) ` '`'/ Baffles Vapor Barrier: 4 mil poly& faced balls DRY WALL NAILING Walls /~~- 3/~~Q~ Ceiling Garage/Ilouse Occupancy Separation ~oCvts~ $/31tJZ O FINAL Public Works Final Approval House Numbers -check for 5" numbers Plumbing Mechanical Insulation Certificale Smoke Detectors n ~% ~10v / // Final -Building -~V l Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit tlBLD01-150 GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's re istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works . requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works eouroval must be received prior to scheduling the Building DegartmenYs final insuection. 7: Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4