CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOI-ISO Issued: 07/19/01 Parcel Number: 973200201
Job Address: 3541 McNeill Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Occupant Load: 5/4 Nature of Work: New house with unfinished basement & attached eara2e
Owner: Gaee and Erin Little Contractor: Little & Little Construction
~~'~~ 1 ~'~~~ ~ j~rfdv
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
EROSION CONTROL
See General Condition #2
Sweeping of paved surfaces may be required to
eliminate the tracking of dirt and debris onto City
rights-of--way
FOOTINGS
Setbacks ~~~~~
Footings /
Forms
Reinforcement
Interior Footings -per veering
FOUNDATION
Stem Wall ~~~ ~n
~'/ ~/0~ (={/
Forms
Reinforcement
Anchor Bolts -per shear wall schedule
Engineered Holdowns
Waterproofing
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Building PertnO NBLDOI-ISO
RE UIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
BCI joist plan shall be. on-site at time of inspection
Joists /7/iIS1 Z
~// ll/ ~~//
~
Blocking !((!!
-
Shieldunder Posts
Positive Connection Post-to-Beam
Positive Connection Post-to-Pier
Treated Wood to Concrete
Anchor Boits & Washers - per shear wall schedule
PLUMBING
Rough-In (D-V-T & Clean Outs)
Water Supply
Water Hammer Arrestor @ Clothes & Dishwasher
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 pad under
Seismic Restraints
Pressure Relief Valve Drain to exterior; terminate
6"-24" above grade
MECHANICAL
Source Specific Fans
Whole House Fan -Floor-2 bath
Environmental Air Exhaust ducting (with backdraft
damper), insulation (R-4) and terminus (located 3'
from openings)
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit NBLD01-150
•
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING:
Walls
Engineered Shear Walls ~-,1 ,,,
//~!//~fi
Attic Venting -ridge & soffit l
Ceilings
Roof -engineered truss plan to be on-site at time of
inspection
Posts, Beams and Headers
Windows Ufactor - .37 or better per WATTSUN
NFRC window sticker must be on windows &
doors at inspection time
Air Seal
Fresh Air. window port
Door UFactor - .19 or better
Truss Positive Connection
Fire Blocking ,/
Z
Weather Resistive Barrier Q
~ 7i ~
INSULATION
Wall(R-19)
J
Floor (R-30 / N
~ ~~/ G
Ceiling (R-30 vault/R-38 attic) ` '`'/
Baffles
Vapor Barrier: 4 mil poly& faced balls
DRY WALL NAILING
Walls /~~- 3/~~Q~
Ceiling
Garage/Ilouse Occupancy Separation
~oCvts~ $/31tJZ
O
FINAL
Public Works Final Approval
House Numbers -check for 5" numbers
Plumbing
Mechanical
Insulation Certificale
Smoke Detectors n
~% ~10v
/
//
Final -Building -~V
l
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit tlBLD01-150
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
re istration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294, press 3. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details). Adjacent
rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works .
requirements have been completed and inspected. For Public Works inspection call 385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works eouroval must be
received prior to scheduling the Building DegartmenYs final insuection.
7: Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.