Loading...
HomeMy WebLinkAboutBLD01-147Wam'nun & Kelz Huddvg 181 Quincy SVeet, Suice 301 Port TownunQ WA 98368 Phone: (360)379-3208 Fsc (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BI.DO1-147 Issued: 07/13/01 Parcel Number: 944-400-401 Job Address: 717 25th Street Zoning: R-II Type: VV=N Occupancy: U-1 Nature of Work: Construct detached pole building for storage Owner: Bettv Jo Yount Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RFOTTTRF,D TNSPF.CTTONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2, install on-site as needed during construction -okay to use existing driveway as ~ construction entrance FOOTING Setbacks Post Footings Forms FRAMING Wall Posts CeilingBoof -site built trusses per engineering Purlins Strongbacks Through-Bolts Blocking Positive Connections FINAL Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemut#BLD01-]47 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including Waiting, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deSciencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works • requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility lice locates 1-800-424-5555 Page 2 of 2 ., ,~ - -. _.-,r ~_