Loading...
HomeMy WebLinkAboutBLD01-145City of Port Townsend Waterman & Kntz Building 181 Quincy 8tree4 PoriTownsend, W A 98368 (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND • c • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD~I-I45 Job Address: 934 Holcomb Street Total Occupant Load: add 1 Owner: Candace Hulbert Issued: 07/20/Ol Parcel Number: 992300036 Zoning: RR=II Type: VV=N Occupancy: RR=3 Nature of Work: Residential Addition Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFf1TTTRFTI TNfiPF.('TTf1NC APPRf)VFD/DATF, EROSION CONTROL Sweeping of paved surfaces may be required to eliminate the tracking of dirt and debris onto City rights-of--way FOOTINGS Setbacks !~~~~ -7 C n ~ l~~i 7~b ~ ~ /// Footings ~ Forms Reinforcement Inte ' Footings E yy~ FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts Vents - 3 required Crawl Access Beam Pockets Alternate Braced Wall Panel Holdowns Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 1 of 4 Building Permit #BLDOI-145 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING BCI joist plan shall be on-site at time of inspection , r 1 `l I Girder ( ~ p ~ j I y/ Joists I v Blocking Shield under Posts Positive Connection Post-to-Beam Positive Connection Post-to-Pier Treated Wood to Concrete Girder to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean Outs) Ql'Lf /~ Water Supply Il G Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi MECHANICAL Bath Fan Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (-ocated 3' from openings) FRAMING: Walls ~ I~~ /~ /,l /J / `% y ~/ I Alternate Braced Wall Panels I' / G c Attic Venting - eave Ceilings Roof Posts, Beams and Headers Windows Ufactor - :39 or better NFRC window sticker must be on windows & door at inspection time Air Seal Door UFactor - .20 or better Rafter Positive Connection Fire Blocking Weather Resistive Barrier Ca1148 hours before you dig for utility line locates • I-800-424-5555 Page 2 of 4 Building Permit kBLD01-145 RE UIRED INSPECTIONS APPROVED/DATE • INSULATION Wall (R-21) ~/J ~~/~ ~D~ 1.,,.~// Floor (R-30) i ( I"b~ Ceiling (R-30 ) Baffles Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING wails 10/lz`o ~ Ceiling FINAL House Numbers -check for 5" numbers Plumbing Mechanical V. B. Paint Certificate Smoke Detectors throughout existing construction: one in each sleeping room and in each area/halhvay leading to sleeping roams with a minimum of one on each floor Final -Building GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Pmnit #BLD01-145 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits eapire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERNIIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4