y CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: RLDO1-144 Issued: 07/09/01 Parcel Number: 948-000-903
Job Address: 1527 Umatilla Street Zoning: R-II Type: VV=N Occupancy: RR=3
Total Occupant Load: 2
Nature of Work: Add 524 sg. ft to single family residence for master bedroom and bath, add 38 sg. ft. of
concrete slab.
Owners: Steven and Shiela McIntire Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Silt Fence as needed
City Rights-of--way shall be kept free of dirt and debris
FOOTINGS
Setbacks ~~~ // -~
//~ ~~~
Footings
Forms
Reinforcement
Interior Footings
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts and washers
Vents - 5 required
Craw] Access
•
Building Prnnit #BLD01-144 ~„
REnIJiRED iNSPF,C'TInNS APPR(IVF.iI/nATF.
FLOOR FRAMING
Engineered BCI joist plan to be on-site @ time of
inspection
o17~'
Joists yy
C
Blocking ll
Shield under Posts
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers
PLIIMBING
Rough-In (D-V-T & Clean Outs) ~ ~ ~~ „ /~
}rl(' ~i
D V ~ (r/
Water Supply /
Hose Bibs (backflow protection required)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water heater
Seismic restraint - 2 places
Pressure relief valve drain to exterior, terminate 6" -
24" above ground
MECHANICAL
Bathroom Fan
f _ Il ~/(`~
Environmental Air Exhaust ducting (with ~(/r
backdraft damper, insulation (R-4) and terminus
(located 3' from opening).
FRAMING
Walls
~
~~f~-j ~/~
Roof- Engineered truss plan to be on-site at ~~
~ (/ l_;!
/
time of inspection \
Attic Venting - eave and gable
Ceilings
Posts, beams & headers
Truss Positive Connection
Windows -egress
Windows -safety glazing (SGD)
Windows/Door U factor - .33 or better per WATTSIIN
NFRC window sticker must be on
windows & doors at inspection time
Air Seal
Fire Blocking
Weather Resistive Barrier
~.
i
Building Permit riBLDO] d 44
RE UIRED INSPECTIONS
APPROVED/DATE
INSULATION ~ /
~1
Floor (R-30) ~I
~
~
~J Qj 1'/ ~ L
Wall (R-19) '
Ceiling (R-38 )
Baffles
Vapor Barrier: required - v.b. paint, faced batts, etc.
Crawl space - 6 mil black poly
DRY WALL NAILING
Walls 7~~0~
V
Ceiling
FINAL
House Numbers - 5"minimum
Plumbing
Insulation Certificate
V. B. Paint Certificate - if applicable
Smoke Detectors throughout existing construction per ~
363
1997 UBC; battery powered ok in existing ~ 1
5
construction
Final -Building
GENERAL CONDITIONS
V-l~
1. Contractors working on this project are required to have a Labor & Industries contractor's
re>ristration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down whi]e this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; cal1385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. onee
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
Building Pa~init #BLD01444 l^ 4
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to kee~
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.