HomeMy WebLinkAboutBLD01-138Waterman & Kets auiWing
161 Quinty Street, Suile 301
Port Townsend, WA 90360
POone: 360J79J208 Fas 360-303-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-138R-4 Issued: 09/27/01 Parcel Number: 948-004-304
Job Address: 3008 Hendricks Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Occupant Load: 411 Nature of Work: Revision #4: Add 120 sg. ft. unheated Four Seasons sunroom.
Owner: Scott Marckx & Jeanie Murphv Contractor: Seraphim Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: See original permit BLDOl-138 for other inspections.
RF(ITTTRFT) TNCPFf TTnNS
APPRnVRn/1~ATF,
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents - I20 =150 = 2 vents located across from each
other for cross ventilation required
Crawl Access
FRAMING
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts and Washers
Walls -per engineered sunroom details
Roof -per engineered sunroom details
Safety Glazing
Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD01.138R-0
KE UIRED INSPECTIONS APPROVED/DATE
INSULATION
Unheated space
FINAL -See also original building permit
Final - Sunroom
GENERAL CONDTI'IONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and CertiScate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval orior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
CaII 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
Waterman & Katz Building
181 Quincy St„ Suite 301
Port Townsend, WA 98368
PFrone (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 385-22 9 4 for Inspection
Permit Number: $LDO1-1388-3 Issued: 09/12/01 Parcel Number: 948-004-304
Job Address: 3008 Hendricks Street Zoning: RR=II Type: VV=N Occupancy: R~3
Occupant Load: N/C Nature of Work: Revision #3: add insulation to accessory shoo/studio to
meet WATTSUN requirements.
Owner: Scott Marckx & Jeanie Murnhv Contractor: Seraphim Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: See original permit BLDOl-138 for other inspections.
RF.OiJiRED INSPECTIONS
APPROVED/DATE
FRAMING- See Attached WATTSUN
Windows UFactor - .51
Doors UFactor - .42
INSULATION -See Attached WATTSUN
Floor (R-30) vented joist @ 16 o.c.
Walls (R-21 + R3.6) INT Lap Wood
Ceiling (R-49) 324 sq. ft. blown attic ADV
FINAL
See Original Building Permit
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
BLD01-138R-3
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept Tree of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Builden~
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Walertnan $ Katz Building
181 Quincy St., Suile 301
Port Townsrnd, W A 98368
Phone (360) 379-3208 Faz: (360) 385.9675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOI-138R-2 Issued: 09112101 Parcel Number: 948-004-304
Job Address: 3008 Hendricks Street Zoning: RR=II Type: VV=N Occupancy: R_3
Occupant Load: N1C Nature of Work: Revision #2: add insulation to sinele family residence to
meet WATTSUN requirements.
Owner: Scott Marckx & Jeanie Muruhv Contractor: Seraphim Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: See original permit BLD01-138 for other inspections.
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING -See Attached WATTSUN
Windows UFactor - .40 & .51
Skylights UFactor - .43 or better
Doors UFactor - .36 & .41
INSULATION -See Attached WATTSUN
Floor (R-30) ventedjoist @ 16 o.c.
Walls (R-21) INT Lap Wood
Gelling (R-49) 368 sq. ft. blown attic ADV
12 sq. ft. blown attic STD baflled
524 sq. ft. blown scissor 5:12 ADV
FINAL
See Original Building Permit
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
BLIxI 1-138R-2
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field.
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Contact the Buildin~
CaI148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
t
•
•
Waterman & Kali Bulldi~
IBI Quincy SIree4 Suite 301
Part Towmend. WA 98368
Phone: 3603793208 Fu 360385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-138R-1 Issued: 07/06/01 Parcel Number: 948-004-304
Job Address: 3008 Hendricks Street Zoning: R_II Type: VV=N Occupancy: RR_3
Occupant Load: 4/1 Nature of Work; Detached studio accessory to SFD (see BLD00-138)
Owner: Scott Marcka & Jeanie Murnhv Contractor: Serauhim Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RFf1TTTRF.TI TNCPFC'TT(lNR
APPRnVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat per attached details
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Interior Footings
UFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents - 4 required
Crawl Access
Beam Pockets
Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 1 of 3
Building Permit #BLDOt-138R-t
REQUIRED IN~PF,C:Ti(7N~ nppunvF.ntne~r>+
FLOOR FRAMING
Engineered BCI plan to be on-site @ time of
inspection
Girders
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
Foundation Vents - 4 required
PLUMBING:
Rough-In (D-V-T & Clean Outs)
Water Supply
Hose Bibs (backflow protection. required)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
FRAMING
Walls
Roof -Engineered truss plan to be on-site at
time of inspection
Attic Venting -ridge & eave
Ceilings
Posts, beams & headers
Windows Ufactor - .36 or better
NFRC window sticker must be on
windows, skylights & doors at inspection time
Air Seal
Skylights - .58 or better
Doors Ufactor-.20 or better
Truss Positive Connection .-
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Wall (R-21 )
Ceiling (R-38 )
Baffles
Vapor Barrier: paint
Crawl space - 6 mil black poly
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
~ 1
.~J
Building Permit #BI.D01-1388-1
RFf1TTTRF.TI TNCPF.rTTfINC APPROVED/DATE
DRY WALL NAILING
Walls
Ceiling
FINAL
Plumbing
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
ret=_istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within su months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
7
•
N4terman & Kah BulWlog
161 Qufney Street, Suke 301
Porl Towroend. WA 98368
PAane: 360379-3208 Fax3 60 385-7 67 5
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 Tor Inspection
Permit Number: BLDO1-13g Issued: 07/06/01 Parcel Number: 948-004-304
Job Address: 3008 Hendricks Street Zoning: R,_II Type: VV=N Occupancy: RR=3
Occupant Load: 411 Nature of Work: New Single-family Dwelling w/ detached studio BLD00.138R-11
Owner: Scott Marckx & Jeanie Murphv Contractor: Seraphim Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
R F (1T TTR F Il 7NCPF. ('TT(1NC
APPRnVF,11/11ATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive OffMat per attached details
FOOTINGS
Setbacks /
~ // 3~
Footings
t/ (,j~
~ l
"
Forms ~
Reinforcement
Interior Footings
P
iers
Po
ch
r
,
7
~
~rr~
FOUNDATION
Stem Wall
~~~ ~~~
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" squaze washers
Vents - 8 required
Crawl Access
Beam Pockets
ABWP) h
ld
ll
l
Al
t
b
d /~
Q9"1?'1 ~a~/O~
owns
race
wa
pane
(
o
terna
e (~i(/iC
Ca1148 hours before you dig for utility Tine locates
1-800-424-5555
Page I of 4
Building Pemtit NBLD01-138
REQUIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
Engineered BCI plan to be on-site @ time of
inspection
Girders
'~~~
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
Foundation Vents - 8 required ,
PLUMBING:
Rough-In (b-V-T & Clean Outs)
Water Supply
Water Hammer Arrestor @ clothes &
dishwasher
Hose Bibs (backflow protection. required)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior,
terminate 6" - 24" above ground
MECHANICAL
Whole House Ventilation
Source Specific Fans
Environmental Air Exhaust ducting (with
backdraft damper), insulation (R-4) and
terminus (located 3' from opening)
~.
Call 48 hours before you dig for utility line locates •
I-800-424-5555
Page 2 of 4
Building Permit tlBLD01-138
•
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls
Alternate Braced Wall Panels
~jfZ fC~~
Roof -Engineered truss plan to be on-site at 7
time of inspection
Attic Venting -ridge & eave
Ceilings
Posts, beams & headers
Windows -egress
Windows -safety glazing
Windows Ufactor - .36 or better
NFRC window sticker must be on
windows, skylights & doors at inspection time
Air Seat
Skylights - .58 or better
Doors Ufactor - .20 or better
Truss Positive Connection
Fire Blocking
Weather Resistive Barrier
INSULATION (~
~,
Floor (R-30) j~/
Wall (R-21 )
Ceiling (R-38 )
Baffles
Vapor Barrier: paint
Crawl space - 6 mil black poly
DRY WALL NAILING n
,J]
y
Walls //
~
G G
Ceiling
FINAL
Public Works Sign-Off
]~ z /~QZ
House Number - 5 "numbers
Plumbing
Mechanical
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #BI,D01.138
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reu_istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall .review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection. •
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval urior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 4