Loading...
HomeMy WebLinkAboutBLD01-136wetemun & lc,a:suihlitg 181 Qui~uy Stml, Suite 301 Port Towmaw~ WA 98368 Photo: (360)379-3208 Fex: (360)379-6973 ~~ CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 8 5-22 94 for Inspection Permit Number: BLDO1-1368-1 Issued: 12/13/01 Parcel Number: 936904403 Job Address: 747 58th Street Zoning: R_II Type: VV=N Total Occupant Load: 7/2 Occupancy: R-3/U-1 Nature of Work:Revision• Add LPG/Wood stove to upper bedroom; install tank 8c i in Owner: Steuhen Ruffo Contractor: Scott Etherinaton ****All elements of engineering including holdowns, framing, nailing, sheathing and other engineered connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTl'S REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFnTTTRF.T) TNSPF,C'TTONS APPROVED/DATE See also OriginallnspectionRecprd MECHANICAL LPG/Wood Stove CHIMNEY Chimney Straps Chimney Termination Spark Arcestor FINAL LPG Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit gBLDOI.136a-1 ~~ 1. Contractors working on this project are required to have s Labor 8c Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of sny and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2244. A minimumminimum of~en~-four hours notice is required. Public Works approval must be received prior to-four hours notice is required. Public Works approval must be received prior to ar6wd..l:na f6a Rnildinv DanorfmnnNs finAl insnecfinn. 7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialproject. S. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and- approval arior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Wataman & Katz auilditg 181 Qtrinry Street, Suite 301 Pat 7'oKmsaM, WA98368 Phone: (360)3793?AB FaB: (360)379fi9I3 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-136 Issued: 7/03/01 Parcel Number: 936 904 403 Job Address: 711 58th Street Zoning: RR=II Type: VV=N Total Occupant Load: 7t2 Occupancy: R-3 /U-1 Nature of Work: Construct Sinele family residence with attached earaee Owner: Stephen Ruffo Contractor: Scott Etherington ****All elements of engineering including holdowns, framing, nailing, strapping and other engineered connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 Mechanical -Propane Tank and Exterior Piping • RE UIRED INSPECTIONS AP PROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding Hydronic Tubing FOOTINGS Setbacks ' / ~/ ~zG~? 07 y Footings Forms Reinforcement Interior Footings Porc iers V Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 Permit M BLDDI.136 RFnTTTRF.n TNSPFCTIONS APPROVED/DATE FOUNDATION J 1 Stem Wall ~~~ ~ / Forms rr Reinforcement Anchor Bolts -see shear wall schedule for spacing Engineered Holdowns SLAB Interior Footings Insulation Thermal Break @ garage Radiant Heat Tubing FLOOR FRAMING NOTE: Engineered BCI floor joist plan shall be on-site at time o C , inspection Joists o Blocking K- ~ Shield under Posts I 1a , Positive Connections l ~ Beam Pockets Treated Wood to Concrete An hor Bolts and Washers _ adiant Heat u PL 0 ~L Rough-In (D-V-T & Clean outs) l W S ~6~ ~ ' y ater upp "" ~ ~ as Su 1 if a livable I l l Water Hammer Arrestor @ clothes and is was er Hose Bibs (backflow protection required) Pipe Insulation (R-3} Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground Call 48 hours before you dig for utility line locates I-800-424-5555 Page2of5 T?iPlIiTTT27i'Tl TNCPF('TT(1N.C /~ppRnVED~E~TF. ' MECHANICAL Boiler -installation instructions shall be on-site at time of inspection Whole House Fan -central exhaust system - mamrfacturer's installation instructions shall be on-site at time of inspection - 7"smooth duct minimum - terminal element 8" - clock timer on fan - other than motorized damper requires letter of certification for flow rates Ducts & Duct Insulation -supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Source Specific Fans Environmental Air Exhaust ducting (w/ backdraR dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: Walls -~___ . _..___.._._.. Engineered shear walls i] ~ Treated Wood to Concrete G h Engineered Posts Beams & Headers ~ ° Ceiling Roof-engineered truss plan to be on-site at time of inspection I ~ f~ G'~ 1 Truss Positive Connection / R f Venting @ 1/l50 Windows -escape Windows -safety glazing Windows U-factor - .50 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Doors U-factor -refer to WATTSUN Fire Blocking Weather Resistive Barrier INSULATION Radiant Slab (R=10) ~2'~7y1 ~ ~.,n71 ,C'3Z Z~~OZ Floor over garage (R-30) Walls (R=19) Ceiling (R-30/R-38) ~,~/~~ / ~2~~~!~C.~ ~~/~2~GG~ ?~z~ Baflles Vapor Baprer: paint 6 mil black poly Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 D ~ 7' Pam6#BLO01-136 REOiJIRED INSPECTIONS APPROVED/DATE '-1 J DRY WALL NAILING Walls Ceiling Garage/House Occupancy Separation ( ?,~ ~ ~1 o v 77 bbb FINAL Public Works Sign-Off ~~t''`-~ ~~ ~?lQ]~ Ilouse Numbers - 5" minimum ~ ~ Z Plumbing A+-~ C~II/D !t- i MechanicaVHeating -ventilation certification for integrated system Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. Ca11 48 hours before you dig for utility line locates I-800-424-5555 Page 4 of 5 Pemtit#BLD01-136 ~~ 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CaII 48 hours before you dig for utility line locates I-800-424-5555 Page 5 of 5