HomeMy WebLinkAboutBLD01-134Wazennan ffi. Kazz
I81 Quinry Street Suite 307
Port Tow2senQ WA 96368
Phone (360) 379-3208 Fex (360) 365-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-1348-I Issued: 10119/Ol Parcel Number: 989 704 206
Job Address: 734 Water Street Zoning: C-III Type: N/C Occupancy: B
Total Occupant Load: NA
Nature of Work: Revision #1: reinforce retaining wall footings by connecting new grade beam and footings
with #4 rebar 10" deep with epoxy at 12 locations and 4" hooks.
Owner: Bank of America
Contractor: McCarthy Construction Co.
NOTE: See original building permit BLDOl-134 for other inspections.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
•
REQUIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Footings - 3' ~/
l ®/Ti~~/
Reinforcement
Grade Beam/Reinforcement
Existing/New Footing Connection - #4, minimum 10" deep, with
epoxy.
FRAMING
CMU Column
18" Grade Beam to New CMU Column Connection
Positive Connections
FINAL ~s ,
Final -Building f
1 ~; r~r,~l, ~,~
Call 48 hours before you dig for utility line locates:
1-800-024-5555
Page 1 of Z
Perotil M HLDO7-134R-1
GENERAL
I. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection. •~
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the Feld. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates:
I-800-424-5555
Page Z of 2
Walumae R Katz
181 Quiary Street Suitt 301
Port Towusrnd, WA 98368
Phone (360) 379-3208 Fax (360) 385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 Tor Inspection
CITY OF PORT TOWNSEND
Permit Number: BLD~1-134
Job Address: 734 Water Street
Total Occupant Load: NA
Owner: Bank of America
Issued: 7102!01 Parcel Number: 989704206
Zoning: C-III Type: N/C Occupancy: B
Nature of Work: Repair of Drive-Uo Canonv
Contractor: McCarthy Construction Co.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REOUiRED INSPECTIONS
APPROVEDIDATE
FOOTINGS /n
Footings - 3' /~~/
((l
Reinforcement
Grade BearrJReinforcment
FRAMING
CMU Column /~ l ~l/S~~t
(~
Existing. Beam to New CMU Column Connection
Positive Connections
G.~~ ~6 /~o~~
/01
FINAL
Final -Building
Ca1148 hours before you dig for utility line locates:
1-800-424-5555
Page 1 of 2
Pemtit#B3,D01-134
GENERAL CONDITIONS _
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works auoroval must be received prior to
scheduling! the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project
8. All building permits expire- if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the Tield. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates:
I-800-424-5555
Page 2 of Z