Loading...
HomeMy WebLinkAboutBLD01-134Wazennan ffi. Kazz I81 Quinry Street Suite 307 Port Tow2senQ WA 96368 Phone (360) 379-3208 Fex (360) 365-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-1348-I Issued: 10119/Ol Parcel Number: 989 704 206 Job Address: 734 Water Street Zoning: C-III Type: N/C Occupancy: B Total Occupant Load: NA Nature of Work: Revision #1: reinforce retaining wall footings by connecting new grade beam and footings with #4 rebar 10" deep with epoxy at 12 locations and 4" hooks. Owner: Bank of America Contractor: McCarthy Construction Co. NOTE: See original building permit BLDOl-134 for other inspections. GENERAL CONDITIONS APPLY -SEE LAST PAGE • REQUIRED INSPECTIONS APPROVED/DATE FOOTINGS Footings - 3' ~/ l ®/Ti~~/ Reinforcement Grade Beam/Reinforcement Existing/New Footing Connection - #4, minimum 10" deep, with epoxy. FRAMING CMU Column 18" Grade Beam to New CMU Column Connection Positive Connections FINAL ~s , Final -Building f 1 ~; r~r,~l, ~,~ Call 48 hours before you dig for utility line locates: 1-800-024-5555 Page 1 of Z Perotil M HLDO7-134R-1 GENERAL I. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. •~ 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the Feld. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates: I-800-424-5555 Page Z of 2 Walumae R Katz 181 Quiary Street Suitt 301 Port Towusrnd, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 Tor Inspection CITY OF PORT TOWNSEND Permit Number: BLD~1-134 Job Address: 734 Water Street Total Occupant Load: NA Owner: Bank of America Issued: 7102!01 Parcel Number: 989704206 Zoning: C-III Type: N/C Occupancy: B Nature of Work: Repair of Drive-Uo Canonv Contractor: McCarthy Construction Co. GENERAL CONDITIONS APPLY -SEE LAST PAGE REOUiRED INSPECTIONS APPROVEDIDATE FOOTINGS /n Footings - 3' /~~/ ((l Reinforcement Grade BearrJReinforcment FRAMING CMU Column /~ l ~l/S~~t (~ Existing. Beam to New CMU Column Connection Positive Connections G.~~ ~6 /~o~~ /01 FINAL Final -Building Ca1148 hours before you dig for utility line locates: 1-800-424-5555 Page 1 of 2 Pemtit#B3,D01-134 GENERAL CONDITIONS _ 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works auoroval must be received prior to scheduling! the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project 8. All building permits expire- if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the Tield. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates: I-800-424-5555 Page 2 of Z