Loading...
HomeMy WebLinkAboutBLD01-132Waterman g xatz 8~tildvg 1 BI Qeinry Stleef, Suite 301 Fat 7owwend, WA 98368 Phone: (36D) 379-3208 Fax: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-132R-4 Issued: 06/17/02 Parcel Number: 989 713 305 Job Address: 642 Harrison Street Zoning: C=III Type: VV=N Total Occupant Load: NC Occupancy: B/R-3 Nature of Work: Revision #3: Revise insulation in basement ceiline/main floor Owner: Steve Scharf ContraMor: Seraohim Builders ****All elements of engineering including holdowns, reinforcing steel, anchor bolts and connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 Mechanical -See MECOl-073 • INSULATION -see also original inspection record Change basement ceiling/main floor insulation to R-20 foe a minimum of 72 sq. ft. -see attached calculations 1. ContraMors working on this project arc required to have a Libor & Industries contraetor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut dawn while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning eoastruction; call 382294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, mac. once construction is complete. Applicant is responsibk: for protection of adjacent properties. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 r~rtsstom-~3zi2~ 3. All elements of engineering including nailing, Loldowna, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is mabk to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Finat Inspections are required prior to occupancy; A Certificate of Occupancy is required for a noo- residential project. 8. All buildmg permits expire if no progress Las hew made withiu siz months, or if no inspections are done by tl~e Building Department witLin one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379208) prior to mailing changes to the approved plans. 10. POST THIS PERNIIT ON-SITE WITH THE APPROVED PLANS. 4~ LJ Ca1148 Lours before you dig for ut0ity line locates 1-800-424-5555 Page 2 of Z Waterman & Katz Building 161 Quinry Steaf, Suite 301 PoR 7ownsenQ WA 96366 Yhona: (360)379-3206 Fax: (360)365-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-132R-3 Issued: 03/18/02 Parcel Number: 989 713 305 Job Address: 642 Harrison Street Zoning: C=III Type: VV=N Total Occupant Load: NC Occupancy: B/R-3 Nature of Work: Revision #3: Revise insulation in basement ceilin¢/main floor Owner: Steve Scharf Contractor: Seraphim Builders ****All elements ojengineering including holdowns, reinforcing steel, anchor bolts and connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 Mechanical -See MECO1-073 INSULATION -see also original inspection record Change basement ceiling/main floor insulation from R-20 to R-11-see attached calculations 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. • Call 48 hours before you dig for utility line locates 1-soaa2a-ssss Page 1 of 2 Pemrit&BLDOI.1321L3 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after-inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress hes been made within siz months, or if no inspections sre done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page2of2 Walemrn$Ya+B~rildieg 181 Quincy Svxt, Soils 301 Pat Tawiuend WA 96368 PMne: (360) 3794208 Fu: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST $E POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: BLDO1-1328-~. Issued: 01/14/02 Parcel Number: 989 713 305 Job Address: 642 Harrison Street Zoning: C=III Type: V_N Total Occupant Load: NC Occupancy: B/R-3 Nature of Work: Revision k2: Revise occupancy separation wall (7u, Qara¢e with approved penetration assembly Owner: Steve Scharf Contractor: Seraphim Builders ****All elements of engineering including holdowns, reinforcing steel, anchor bolts and connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHtED: Electrical -Contact Labor & Industries @ 360-417-2702 Mechanical -See MECOl-073 . NOTE: Special inspection required for 3000 psi concrete per UBC Section 1701.5 Item 1. Special Inspector shall be a Washington licensed engineer or ICBO certified inspector to either be listed in the current edition of WABO Agency and Inspector Register or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. RF.OiJIRF,D INSPECTIONS APPROVED/DATE FRAMING Area Separation Wall -perfire-resistive construction listed in UBC Table 7-B (attached) Firestopping -per detail W-L-1128 (attached) DRYWALL NAILING Area Separation Wall -per attached details, UBC Table 7 B Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Pmnit q BIDOI-132 1. Contractors working on this project are required to have a Labor &c Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any snd all deficiencies noted 6y required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aunroval must be received prior to • scheduling the Building Department's final insuection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential projeM. 8. All building permits expire if no progress has been made within six months, or if no inspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2 Waterman & Katz Building 18I QuinaY Street, Suite 301 Port 7owwend, WA 98368 Phone: (360)379-3206 Fen: (360)3857675 CITY OF PORT TOWNSEND CONSTRUCTIONPERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-1328-1 Issued: 07/12/01 Parcel Number: 989 713 305 Job Address: 642 Harrison Street Zoning: C=III Type: VV=N Total Occupant Load: 16 Occupancy: R-3 Nature of Work: Increase basement foundation wall & concrete floor Owner: Steve Scharf Contractor: Seraahim Builders ****All elements of engineering including holdowns, reinforcing steel, anchor bolts and connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHdED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Special Inspection required for 4000 psi concrete per UBC Section 1701.5 Item 1. • Special Inspector shall be a Washington licensed engineer or ICBO certified inspector to either be listed in the current edition of WABO Agency and Inspector Register or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. RF.nT1TRF,1) TNSPF,('TTONS APPROVED/DATE DEMOLITION Materials from demolition shall be hauled to the Jefferson County Landfill or other approved areas off-site in accordance with state and local laws FOOTINGS Setbacks Footings Forms Reinforcement • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit # HLDOI-1328-I. REQUIRED INSPECTIONS APPROVED/DATE CONCRETE STAIItS Reinforcement Rise Run FOUNDATION/CONCRETE BEAM/SLAB Stem Wall Forms Reinforcement Anchor Bolts & Washers - 5/8" Engineered Holdowns Crawl Access to Breezeway Crawlspace Beam Pockets Waterproofing R-20 Insulation Treated Wood to Concrete 1. ContraMors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 Permit#BLDOI-I32R-1 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 •_r wekm~ ~ x~aWmu~ iai Q~r sue, sWm3m Pat'[ow+ua~ WA98368 Phone: (360)3193208 Faz: (360)365-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 Tor Inspection Permit Number: BLDO1-132 Issued: 08/27/01 Parcel Number: 989 713 305 Job Address: 642 Harrison Street Zoning: CIII Type: VV=N Total Occupant Load: 16 Occupancy: B/R-3 Nature of Work: Dental Clinic Expansion with Residential Unit Above (see R-1 for foundation work) Contractor: Seraphim Builders Owner: Steve Scharf ****All elements of engineering including holdowns, reinforcing steel, anchor bolts and connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE ~~ O ~ S $ V l%D 2~/`S~O L (..(~ SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • N TE: Special Inspection required for 3000 psi concrete per UBC Section 1701.5 Item 1. - Special Inspector shall be a Washington licensed engineer or ICBO certified inspector to either be listed in the current edition of WABO Agency and Inspector Register or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. RE UlRED INSPECTIONS APPROVED/DATE FLOOR FRAMING -Engineered joist plan shall be on-site at lime of inspection Beams Joists Blocking One-hour floor Engineered Straps and Holdowns Positive Connections Treated Wood to Concrete Mechanical -See MECO1-073 Ca1148 hours before you dig for utility Line locates 1-800-424-5555 Page 1 of 4 ~. Permit#BLINII.132 RE UIRED INSPECTIONS APPROVED/DATE PLUMBING -Barrier-Free Required @ clinic Rough-In (D-V-T & Clean Outs) Water Supply Gas Supply Ek'C'~,Q,( f1'~j, Water Hammer Arrestors @ clothes and dishwasher Backflow Protection Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraints Pressure Reduction Valve Drain to exterior; 6" - 24" A. G. p ~ n j~ D~2 ~~~ (\~( ~~\J ! `/ W ~ ~~ ``/Z ~/PYf / ~'" MECHANICAL -see Mechanical Permit #MECOI-073 for clinic LPG Stove in dwelling unit Whole House Fan @ Bath Kitchen Fan Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from openings into building) /~~~ l ~/ ~ n~ r // Z ~ / ~ , ` FRAMING Walls ` s"r ~%GBFI1~i f ~Z ?~~ Walls -advanced framing @ dwelling unit Engineered Shear Walls c~~~fq-2 (icG./i(~,g `b/jQ~/ One-Hour Exterior Wall Area Separation Wall Ceiling Roof -Engineered truss plan on-site at time of inspection ~d ~ LD(~,'~ I T~ (p~0 Attic Venting -ridge & eave 1 Windows -escape Window U-Factor @ dwelling unit -see attached WATTSUN Window U-factor @ clinic - .75 or better NFRC sticker shall be attached to windows at time of inspection Window Safety Glazing Air Seal Window or Wall Ports @ dwelling unit Door U-Factor @ dwelling unit - .40 or better Opaque Door U-factor @ clinic - .60 or better Parapet Wall Engineered Posts and Beams -DF#I U.O.N. Truss Positive Connections Fireblocking Firestopping Draft Stops Weather Resistive Barrier Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 v~ Permit q BLU01-132 REQUIRED INSPECTIONS appunvFnmeTF INSULATION Dwelling Unit ~G'_/ ~flt1-S~.I ~~U~~ ~~~(. Floors (R-38) Walls (R-21 advanced framing) f ~ 7/ ~7~~w~ l"~1 G Ceiling (R-30 @ vault) I Clinic Floors (R-19) Walls (R-19) ~ Roof (It 21) ~~~~~~ - Baffles Vapor Barrier DRYWALL NAILING Walls O h i ll / ' , / ~J~ lilt- Zh2~ Z/~4Z/'/ ` ne- our exter or wa 1 Area Separation Wall One-Hour Occupancy Separation' Ceiling /f~~ ~ Zd~/~;~,pp~ /Zl~r T FINAL LPG Fire Department Sign-Off Electrical Sign-Off Building Numbers -minimum 5" Plumbing -Barrier Free Required @ clinic Mechanical -see also MECOI-073 Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors @ dwelling unit - Barrier Free Access @ clinic -entrance, stairs, restroom, handrails and extensions, maneuvering @ doors, thresholds, lever hardware, parking, etc. Exit Signage Final -Building ~~~~~ Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 <: r~nacuoi-iaa -, 1. Contractors working on this project are required to have a Labor & Industries contractor's re istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down white this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is repaired Public Works aoaroval must be received prior to scheduling the Buildine Deuartment's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 -_ --.,.