Loading...
HomeMy WebLinkAboutBLD01-129 Waterman & IC~Building I81 Quinry Streµ Suite 301 PM Towuend, WA 98368 Phone: (360) 3793206 Faz: (360) 319-6923 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOl-129 Issued: 9117101 Parcel Number: 001044008 Job Address: 2800 & 2802 20`" Street Zoning: R-I Type: VV=N Total Occupant Load: 5/3 Occupancy: R-3/U-1 Nature of Work: Construct Sinele family residence with attached ADU & saraee Owner: Ed & Cynthia Steeall Contractor: Blue Heron Construction / - GENERAL CONDITIONS APPLY -SEE LAST PAGE ~G~ ~ S SV'~D)) ~ Z'2~J DTI ~- {j _yLQ l ~ i ~O v SEPARATE PERMITS REQUIRED: ~~ ,` r~nn ~Z~ ~ Electrical -Contact Labor & Industries @ 360-417-2702 !~PtC ~ `~, ~ L ~~`~ r RR(ITTTRF.n TNCPF.C'TT(lNC APPRnVF,I)/I~ATF. TEMP EROSION & SDM'T CONTROL See General Condition No. 2 and SUDPOI-032 Erosion control measures shall be installed on-site Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~~l~~d / C/,J/f ~~ Footings Forms Reinforcement Interior Footings R-10 Thermal Break D~ers E FOUNDATION Stem Wall ~~~Z 3~~(' ~ ' R-10 Thermal Break ~ Forms Reinforcement Anchor Bolts & Washers Alternate Braced Wall Panel Holdowns Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Pe~mil#HLO01•'k9 RE UIRED INSPECTIONS APPROVED/DATE SLAB Interior Footing R-10 Thermal Break Radiant Floor Tubing / ~/~} /01 t !(/ `/ FLOOR FRAMING NOTE: Engineered BCI jloor joist plan shall be on-site at time of inspection Joists Blocking Treated Wood to Concrete Positive Connections Anchor Bolts anfl Washers Radiant Heat Tubing PLUMBING: Rough-In (D-V-T & Clean outs) fIn70~2~,Q0uND ~~v~-~ tN~ Water Supply / l~(p/0! (~ Gas Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) / Pipe Insulation (R-3) ~ ~ 1 Z~0 Pressure Reduction Valve if> 80 psi W H ~ ' ater eater R-10 Insulation under ~,` ~ /~ W+'~+~TV/~0.~tw Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate ~ 2~ ~~ 6" - 24" above ground ~~v~~-y p~lS~ MECHANICAL -appliance installation instructions shall be on-site at time of inspection LPG/Wood Stove Boiler Whole House Fan -ground floor bath @ house/bath @ apt. Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) /x..11 AO 1....,.... L..t .... .......l:.. P.... sa:a-. 1:-... 1......4.... van va uvulo uclulc yvu w~ ro1 uuuay uaw 1-800-4245555 Page 2 of 4 T, r pa,,,aaBtoot-t7s ? ' ~REOUIRED INSPECTIONS APPROVED/DATE i'__' a FRAMING: Walls Alternate Braced Wall Panels Treated Wood to Concrete Ceiling Roof- engineered truss plan to be on-site at time ojinspection Truss Positive Connection Roof Venting -ridge & eave Windows -escape Windows -safety glazing Windows U-factor - .32 or better jor house/see Option I or II or studio apartment Door U-factor - .20 or better NFRC window sticker must be on windows and doors at inspection time Fresh Air -wall ports Air Seal Fire Blocking Weather Resistive Barrier ' INSULATION Slab (R=10 under entire slab w/ thermal break ) Floor (R=30 over unheated space) Walls (R-19/21 for ADU depending on option/R24 for house ) Ceiling (R=30 for attic ) Baffles Vapor Barrier: 4 mil poly DRY WALL NAILING Walls Ceiling One-hour construction for separation between dwelling units Garage/House Occupancy Separation Interior Braced Wall Panels FINAL -Studio Apartment & House/garage LPG Public Works Sign-Off House Numbers - 5" minimum Plumbing Mechanical Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building • CaII 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 -~ r~~xatnm.fv;' f 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspeMion call 385-2294. A minimum of twenty-four hours notice is required. Public Works anaroval must be received arior to scheduline the Buildine Department's Cnal inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialproject. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 4 of 4