Loading...
HomeMy WebLinkAboutBLD01-128T Watem~an & Katz Building 181 Quincy Sired Suite 301 PoM1 Townsend, WA 98368 Phone (360) 379-3208 Faz (360) 385-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-I2g Issued: 06/26/01 Parcel Number: 948-332-301 Job Address: 921 McPherson Street Zoning: R-II Type: V_N Occupancy: R_3 Total Occupant Load: 1 Nature of Work: Remodel/Addition to garage for massa¢e studio Owner: Sally Sareis Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFfITTTRF,11 TNSPF.C'TTf1NS APPRnVF,T)/T)ATF, TEMP EROSION & SDM'T CONTROL See General Conditio~r #2 Silt Fence as needed Drive Off Mat per attached details MONOLITHIC SLAB Setbacks Forms I~ b •~~ ~oLJ ~ • ~\ ~ l3 ~ t) \ Reinforcement Anchor Bolts R I,1 ~ ' `~ FLOOR FRAMING Joists Blocking /Z /~~~, ! / Treated Wood to Concrete / Call 48 hours before you dig for utility line locates I-800-.424-5555 Page 1 of 4 Building Permit N01-118 REQUIRED INSPECTIONS APPROVED/DATE PLUMBING: Rough-In (D-V-T & Clean Outs) Water Supply Hose Bibs (backflow protection. req'd.) Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior /~~ lJ/ O aj MECHANICAL LP Gas Stove Mamrfacturer's Installation Instructions to be on-site @ time of inspection Whole House Ventilation: @ bath /I ~ Kitchen Fan l~lO~ ! (~/' y Environmental Air Exhaust ducting, insulation ~ (R-4) and terminus (located 3' from opening) , FRAMING: Walls / Roof C IR 1 ~ ~, Attic Venting -ridge & eave ll 111 Ceilings Posts, beams & headers Windows -egress Windows -safety glazing Windows Ufactor - .65 or better NFRC window sticker must be on. windows & doors at inspection time Air Seal Fresh Air: Wall ports Doors Ufactor - .40 or better Rafter Positive Connection Fireblocking Weather Resistive Bamer Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Building Permit NO]•tT8 • RE UIRED INSPECTIONS APPROVED/DATE INSULATION QQ ~- " jL l / ~ Floor(R-19) 0 0~ i~ Wall (R-19 ) Ceiling (R-38) Baffles ~~~~~~ , ~~(S?_ ~~ Vapor Barrier: paint DRY WALL NAILING ll W /~~„ `,~~ ~ a s . / -~- Ceiling FINAL LPG House Number -check 5" numbers bi Pl ~~~~~~ um ng a Mechanical Insulation Certificate V. B. Paint Certificate Smoke Detectors Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4 Building Permit #Old2e' t 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Warks inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to - scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 4