Permit Number: $LDUI-127 Issued: 06/07/01 Parcel Number: 989708101
Job Address: 419 Benton Zoning: RR=H Type: VV=N Occupancy: R_3
Nature of Work: Remove existing cedar roofing, install sheeting, felt and composition shingles,
provide ridge ventilation.
Owner: Jeff Kelety
Contractor: Hoae Roofing
385-5653
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
•
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o. c. Feld or
1 3/" staples @ 6" o.c. edges and field.
ROOF VENTING
Ridge
Net free ventilation area shall not be less than 1 square
foot per I50 square feet of the area of the space
ventilated, unless 50% of the required vent opening
area is provided in the upper portion of the roof and
therefore the rate maybe reduced to 1 squaze foot of
venting to 300 square feet of area vented. Openings
shall be covered with corrosion resistant''/4" mesh.
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter 15.
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit NBLD01-729
FINAL
Smoke detectors required per 1997 UBC (battery
powered OK)
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
ENERAL CONDITION
L Contractors working on this project are required to have a Labor & Industries contractor's re¢istrstion
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
constrnction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is reauired. Public Works anoroval must be received nrior to
scheduling the Building DeoartmenYs final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555