Loading...
HomeMy WebLinkAboutBLD01-126WMemtan ~ Katz Building 781 QuN%Street, Suite 301 Port Toxmsrnd WA 98368 Phone: (360) 3N3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDOI-126 Issued: 09/17!01 Parcel Number: 972-903-901 .Tob Address: 5509 Wilson Street Zoning: R-II Type: VV=N Occupancy: U-1 Nature off Work: Construct 420 square foot Pole Garage • Owner: AI Higgins Contractor: Building Brokers (3b0) 683-6216 GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2, install on-site as needed during construction FOOTING Setbacks Post Footings - (9) 6"x 18"x4' per stamped plans Forms FRAMING Walls -2" x 6" DF #2 grrts @32" o.c. Ceiling/Roof-engineered truss plan shall be on-site at time of inspection Purlins @ 2' o.c. w/LU26 hangers Blocking Girt-to-Truss Positive Connection - (3) 16d hardened steel ringshank nails Girt-to-Post Purlin-to-Truss Positive Connection - LU26 Truss-to-Post Positive Connection - (5) 20d nails FINAL Final -Building • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pttmit K BLD01-126 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulingthe Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- • residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 •