HomeMy WebLinkAboutBLD01-126WMemtan ~ Katz Building
781 QuN%Street, Suite 301
Port Toxmsrnd WA 98368
Phone: (360) 3N3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDOI-126 Issued: 09/17!01 Parcel Number: 972-903-901
.Tob Address: 5509 Wilson Street Zoning: R-II Type: VV=N Occupancy: U-1
Nature off Work: Construct 420 square foot Pole Garage
•
Owner: AI Higgins
Contractor: Building Brokers
(3b0) 683-6216
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT
CONTROL
See General Condition No 2, install on-site as
needed during construction
FOOTING
Setbacks
Post Footings - (9) 6"x 18"x4' per stamped plans
Forms
FRAMING
Walls -2" x 6" DF #2 grrts @32" o.c.
Ceiling/Roof-engineered truss plan shall
be on-site at time of inspection
Purlins @ 2' o.c. w/LU26 hangers
Blocking
Girt-to-Truss Positive Connection
- (3) 16d hardened steel ringshank nails
Girt-to-Post
Purlin-to-Truss Positive Connection - LU26
Truss-to-Post Positive Connection - (5) 20d nails
FINAL
Final -Building
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pttmit K BLD01-126
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulingthe Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- •
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
•