Loading...
HomeMy WebLinkAboutBLD01-125 Waterman & Kati Building IBI Quinq Street, Suite 30l Perl7ownaend~ WA 98368 Phone: 360379J208 Fa:360J65-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD~1-IZrJ Job Address: 650 S Street Total Occupant Load: 2 Owner: Nancv Alvarez Issued: 06/22/01 Parcel Number: 985-800.101 Zoning: R-III Type: VV=N Occupancy: RR=3 Nature of Work: New ADU Contractor: Wa1lvWorks Enterprises GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFnTTTRF.TI TNCPFC"TTONC APPRnVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat per attached details FOOTINGS Setbacks //~ ~ "~ ~~/~ /©' /~ ,t 6 j ~/ Footings 7 Forms Reinforcement Interior Footings Porch Piers LIFER FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Vents - 5 vents required Crawl Access Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Building Pemut #BLDOI-125 .. REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Girders Joists r) / nn Blocking ~ G/ D~ / 1 G `(U `vU~ Shield under Posts \ , Positive Connection Post -to-Beam Girder to Concrete Positive Connection Post-to-Foundation Wall Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents - 5 vents required PLUMBING: Rough-In (D-V-T & Clean Outs) ~/ ~ Water Supply l ~l Hose Bibs (backflow protection. req'd.) r( ation - R-3 Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places relief valve drain to exteri MECHANICAL as o Manufacturer's Installation Instructions to on-site @ time of inspection Whole o Source Specific Fans Q~~/~~ ni~ Environmental Air Exhaust ducting, insulation v 1.~ (R-4) and terminus (located 3' from opening) FRAMING: Minor Improvement Permit required prior to framing ~'/ ~D ~ / ~(~ Walls / I ' ~j I l.{ Roof \ Attic Venting -ridge & soffit Ceilings Posts, beams & headers See next page for additional framing • Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 Building Permit #BLlxll-125 RF.niTiRF.D INSPECTIONS APPROVED/DATE ~J FRAMING: continued Windows -egress Windows -safety glazing (SGD} Windows Ufactor - .40 max. NFRC window sticker must be on windrnvs & doors at inspection time Air Seal Fresh Air: Wall ports Doors Ufactor - .40 or better Rafter Positive Connection Weather Resistive Barrier INSULATION „ / Floor (R-25) ~~ ~/~/~/ (~ Wall(R-19) Ceiling (R-30 ) Baftles Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAILING lb y/O, Walls Ceiling , FINAL Public Works Sign-Off House Number Plumbing Mechanical -Ventilation Certification for Integrated System Insulation Certificate V. B. Paint Certificate Smoke Detectors Final -Building Z/ jJ071 • Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Building Pmnit #BLDOI.125 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's • registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspeMion. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. • 8. All building permits expire if no progress has been made within six months, or it no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility liue locates 1-800-424-5555 Page 4 of 4