Permit Number: BLDOI-I23 Issued: 06/07/01 Parcel Number: 957306505
Job Address: 1738 Washington Street Zoning: RR=H Type: V_N Occupancy: RR=3
Nature of Work: Remove existing cedar roofing. install sheeting, felt and composition shingles,
provide attic ventilation.
Owner: Weslev Doan
Contractor: Affordable Services
385-2724
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
' all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or
I '/<" staples @ 6" o.c. edges and field.
ROOF VENTING
Attic Vents
Net free ventilation azea shall not be less than 1 square
foot per 150 square feet of the area of the space
ventilated (15 square feet), unless 50% of the
required vent opening azea is provided in the upper
portion of the roof and therefore the rate may be
reduced to 1 square foot of venting to 300 square feet
of area vented (7.5 square feet). Openings shall be
covered with corrosion resistant'/<" mesh.
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter 15.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
PemtilfBLD07-723
FINAL
Smoke detectors required per 1997 UBC (battery
powered OK)
House Numbers - 5" numbers of contrasting color
posted neaz main entrance of house and visible from
street per City Ordinance
Finat -Building
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of sik
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspeMion is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294. A
Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspeMions are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior fo making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555