Loading...
HomeMy WebLinkAboutBLD01-122City of Port Townsend Waterman & Katz Building 18I Quincy Street, PortTownsrnd, WA9ti368 (360) 379-3208 Fax (360) 385.7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BI.D~I-122 Job Address: 4509 Louez Avenue Total Occupant Load: add 1 Owner: Gerald and Gail Danner Issued: 06/18/01 Parcel Number: 992300036 Zoning: R_II Type: VV=N Occupancy: RR=3 Nature of Work: Residential Addition Contractor: Little & Little Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHtED: Electrical -Contact Labor & Industries @ 360-417-2702 REOiJiRED INSPECTIONS APPROVED/DATE EROSION CONTROL Sweeping of paved surfaces may be required to eliminate the tracking of dirt and debris onto City rights-of--way FOOTINGS Setbacks 7~~~~dl Footings Forms Reinforcement Interior Footings UFER FOUNDATION Stem Walt ~~~ Forms (/ (JZ Cll "~ Reinforcement Anchor Bolts Vents - 5 required Crawl Access Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Building Pcrntit NBLDOI-l22 REQUIRED INSPECTIONS APPRnVF.n/nATF. FLOOR FRAMING BCI joist plan shall be on-site at time of Inspection - 7oists Blocking _ (%f 1 ~ ~ l Shield under Posts I Positive Connection Post-to-Beam Positive Connection Post-to-Foundation Wall Treated Wood to Concrete Girder to Concrete Anchor Bolts & Washers ING ---- --_ Rough-In (D-V-T & Clean Outs) ~ ater Supply ~~ ~, ~ ~~ d ~ a er ammer Arrestor @ Dishwasher -- -- Pipe Insulation (R-3) ' Pressure Reduction Valve if> 80 psi MECHANICAL Kitchen Fan Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from openings) FRAMING: Walls Attic Venting -ridge & soffrt Ceilings a lL Roof d d ~'~ Posts, Beams an Hea ers Windows Ufactor - .53 or better per WATTSUN r ~ Cf'p, NFRC window sticker must be on windows & << j skylights at inspection time S li hts - .44 or better ~~ C Air Seal ~ 1[ , ~ Fres r. window or wa port require ~ ~ ~-~ '~ Door a - . Rafter Positive Connection Fire Blocking 0 • ~~~ - l ~ b ~ r Weather Resistive Barrier G l ~ J ~o~ • Ca1148 hours before you dig Tor utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #BLIHII-122 • RF,OiIIRED INSPECTIONS APPROVED/DATE INSULATION ~ f~~ Wall (R-19) ~ ~ ~ L ~~ r Floor (R-30) Ceiling (R-30 ) Baffles Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING Walls ~J, ~~ Ceiling ~~ G ~ ~~` ~ FINAL House Numbers -check for 5" numbers Plumbing Mechanical V.B. Paint Certificate Smoke Detectors throughout existing construction: one in each sleeping roam and in each area/halhvay leading to sleeping rooms with a minimum of one on each floor ~ ~/ ~ 3 ~ ~ _ n ( / 'l)//l Final -.Building v J GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4 /az Building Pemtit #BLA01-122 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aoaroval must be 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential projeM. 8. All building permits ezpire if no progress has been made within siz months, or if na inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Cali 48 hours before you dig for utility tine Locates I-800.424-5555 Page 5 of 4