No preview available
HomeMy WebLinkAboutBLD01-120t +! ~ Building and Community Deve]opment Waterman & Kaa Building <- 181 Quincy Street Suite 301 Port Townsend, W A 98368 Phone: (360) 379-3208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND n U CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: $LDO1-120 Issued: 06/22/01 Parcel Number: 968100307 Owner: Jessica Patterson Contractor: Prestiee Proaerties, Inc. Job Address: 375 Woodland Avenue Zoning: R-III Type: VV=N Occupancy: RR=3 Total Occupant Load: 5 Nature of Work: Set Manufactured Home with site-built Dorch. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RRniTiRF,D iNSPF.CTInNS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See details attached to SDPOI-035 and general condition #2 Silt Fence Drive Off Mat FOOTINGS/SLAB (~~ ~}J~ ' Setbacks Forms Reinforcement Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 r~,assc.oor•iso t RE UIRED INSPECTIONS APPROVED/DATE PLUMBING (prior to skirting) Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, ~ ~ ~ ~ ~ G ~ min. 3/, "diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 ps. i. for I S minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"above ground Drainage Piping -sloped min. %:"per foot MECHANICAL (prior to skirting) Ducts & Duct Insulation (0~ ~ 7-~ b Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed 19' w/ 2-90° elbows FLOOR FRAMING (prior to skirting) Ot t ~' O 1 Anchors Steel Support Piers -Load-stamped and installed per manufacturer's installation manual; clearance of 18"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation mamral specifies; otherwise area around home graded to provide runoff away from home. FRAMING: Entry porch/decks FINAL Public Works Sign-Off n q ( 1 f/ ~ ~ ~ ~ 0 1 Electrical (L & I) Sign-Off _ /`' 1 f I l House Number -minimum 5" numbers Plumbing Mechanical Final -Building No holes or gaps greater than %, "allowed in skirting. Skirting to be rated for contact with earth if backfidl is involved. Crawl space ventilation per installation manual @ I sq. ft./150 sq. ft. (1 D required); located close to corners, on at least two opposing sides for cross ventilation. (See next page) Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 ~ ~- ~t , Permit N BLDOl-120 FINAL continued: Crawl space access must provide access to all areas under home; minimum 18" x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. GENERAL GONDTI'IONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. • 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 f ~. ~ "`` _.''.~.`°°_ ;yam. ~ w=-~-~.~.-- _-