Loading...
HomeMy WebLinkAboutBLD01-118Waterman & Ka[z Bwlding 18I QwneY BUeet, 8wle 301 PoM1 Towmvend WA98368 PMne (360) 379-3208 Faz: (360) 385-7675 !`TTV (lF P(1RT T(1WNCFNiI CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BL,D~l-11g Job Address: 1032 Garfield Street Issued: 06/08/01 Parcel Number: 933200017 Zoning: RR=H Type: VV=N Occupancy: R-3 Nature of Work: Remodel bathroom: replace plumbing, floor foists, insulation, and fixtures. Add shower. Owner: Charles Paul Contractor: Townsend Builders GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.tliflfRF.T) iNRPF.CTif1NS L APPROVED/DATE FLOOR FRAMING ~y /J ~ ?~J3/Ot' Joists 7~tY.D01 ~/ '~",~ / , Blocking Positive Connection Treated Wood to Concrete ' Anchor Bolts & Washers PLUMBING ~ ~c 7 ~ a ~(f , ~ j C/ ~'"~' Rough-In (D-V-T & Clean Outs) Water Supply Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi MECHANICAL / nn Bathroom Fan ~~~ ~ ~ / /~VI / Environmental Air Exhaust ducting, insulation C (R-4) and terminus (located 3' from opening) INSULATION d~ Floor Q //~iG-- 9/z s~~/ (~ Exterior Walls (R-22) Ceiling (R-38, blown-in) Baffles Vapor Barrier :faced balls 6 mil black poly in crawl Fill exposed cavities Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Pemtit # BLD01-118 REQUIRED INSPECTIONS APPROVF,D/DATF. ' DRYWALL NAII.ING Walls Ceiling ~~~ ~ ~~~ FINAL House Numbers - 5" minimum Plumbing Mechanical ~,/ ~/ 2(~Q Z Insulation Certificate (if applicable) ( !! Smoke Detectors throughout existing construction per 1997 UBC Final -building GENERAL CONDTTIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily • stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aaoroval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non-residential project. Call 4S hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 Pemtit b HLDO7-11 B 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. U • Ca1I 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 3 __-:.