HomeMy WebLinkAboutBLD01-116Wazemun &. Katz Building
] 81 QuinnY 8tree4 Suite 301
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 365-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOI-I I6 Issued: 05/29/01 Parcel Number: 988800205
Job Address: 739 Adams Street Zoning: RR=H Type: VV=N Occupancy: RR=3
Nature of Work: Remove existing cedar roofing, install sheeting, felt and composition shingles,
provide ridge ventilation.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
Owner: Judv D'Amore
REOIJIRED INSPECTIONS
Contractor: Hope Roofing
385-5653
APPROVED/DATE
l.J
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
1 all local, state and federal laws.
SHEATHING
Structural roof sheathing requires 8d @ 6" o.c. edges
& 12" field or 1 '/a" staples @ 6" o.c. edges and field.
ROOF VENTING
Ridge
Net free ventilation azea shall not be less than 1 square
foot per 150 square feet of the area of the space
ventilated, unless 50% of the required vent opening
area is provided in the upper portion of the roof and
therefore the rate maybe reduced to 1 square foot of
venting to 300 square feet of area vented. Openings
shall be covered with corrosion resistant t/a" mesh.
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter 15.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Prnnit #BLDOI-116
FINAL
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to beginning construMion; ca11385-2294. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspeMion on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required Public Works aonroval must be received urior to
schedulin¢ the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits eapire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making c3~anges to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2