Loading...
HomeMy WebLinkAboutBLD01-114Waterman & Katz Buildvtg 181 Qwrwy Street, Suite 301 Port'Iawruerd, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-ll4R-1 Issued: 9/04/01 Parcel Number: 948-302-904 Job Address: 564 14th Street Zoning: R-III Type: VAN Occupancy: R-3 Total Occupant Load: N/C Nature of Work: Revision #1: en¢ineered sheer walls: aer 8/31/01 letter from Tillman EnaineerinQ ''/z" alvwood sheetine on each side of wall with Sd (a, 4" on the outside and lOd (7a, 3" on the inside with same holdowns is equivalent shear streneth to Simpson en¢ineered Hanel. Owner: Hometown Construction, Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: • Electrical -Contact Labor & Industries @ 360-417-2702 See original permit BLDO1-114 for other inspections. RF,nTTTRED INSPECTIONS APPROVED/DATE FRAMING Walls -plywood panels as specified in 8/31/01 letter FINAL Final - See Original building permit Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemti[ q BL.WI-174R-I G .N . AT, CONDTTTONS 1. Contractors working on this project are required to have a Labor & Industries corrtractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveted construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, boldowns, sheathing, and alternate braced wall panels (ABWP) require inspeMion prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval r~or to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THLS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2 l t • C~ Wetertnan & Katz Building I S] Quincy Street, Suite 301 PoM1 7owe®end, WA 98366 Phone: (360) 379-3208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-114 Issued: 6/27/01 Parcel Number: 948-302-904 Job Address: 564 14th Street Zoning: R-IH Type: VV=N Occupancy: R-3 Total Occupant Load: 3 Nature of Work: Construct single-family residence Owner: Hometown Construction, Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @.360-417-2702 RF.(1TTTRF.D TNSPF,CTT(~NS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks. ~~ ~ ~~ %y' ///~ ~Q ~j~ Footings W'w j ~ l f y ""l Forms Reinforcement Interior Footings Porch Piers UFER Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of A a acnot-na REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall , Forms Reinforcement Alternate Braced Wall Panels Positive Connection Post-to-Foundation Wall Anchor Bolts w/ 2" x 2" x 3/16" washers Foundation Vents - 6 required Crawl Space Access FLOOR FRAMING Girders Joists ~~~/„ /t~ ~j Blocking ~ ~~((// ~m11 1~'y Shield under Posts l Positive Connection Girder to Concrete Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestor @ clothes washer and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan - F-2 Bath Source Specific Fans Environmental Air Exhaust ducting (w/back draft dampers), insulation (R-4) and terminus (located 3' from opening into building) Ca1148 hours before you dig for utility line locates. 1-800-424-5555 Page 2 of 4 Permit k BLDOI-I14 • RRnTTTRF.D TNSPECTiONS APPROVED/DATE FRAMING ll W ~Y~~~' /'-~~~ ~,11~~ 1. r a s Ceilings f'i~~~ 2 ~ ~~~ , Roof -Engineered LPI rafter plan to be on-site at time of inspection Rafter Positive Connection Attic Venting -see code requirement sheet #77 Windows -escape Window safety glazing Windows Ufactor - .40 maximum NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .20 maximum Fire Blocking Weather Resistive Barrier INSULATION ~ ~ J /I /1_ ~ Cam(/(G(/ ~- l~ Floor (R=30) ~/ / _ ol Walls (R=19) '/ Ceiling (R_38 in flat & scissor truss, RR=30 in vault) Baffles Vapor Barrier: low perm. paint Crawl space - 6 mil black poly DRY WALL NAILING / / I Walls ~// /a y Ceilings / Enclosed Usable Space Under Stairs FINAL Public Works Sign-Off House Numbers - S "minimum Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Puvtit q BLD01-114 • 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent'properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass Tinal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Buildin¢ Department's final inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least .one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rn for to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4 ~~