CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-ll4R-1 Issued: 9/04/01 Parcel Number: 948-302-904
Job Address: 564 14th Street Zoning: R-III Type: VAN
Occupancy: R-3 Total Occupant Load: N/C
Nature of Work: Revision #1: en¢ineered sheer walls: aer 8/31/01 letter from Tillman
EnaineerinQ ''/z" alvwood sheetine on each side of wall with Sd (a, 4" on the outside and lOd (7a, 3" on
the inside with same holdowns is equivalent shear streneth to Simpson en¢ineered Hanel.
Owner: Hometown Construction, Inc.
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
• Electrical -Contact Labor & Industries @ 360-417-2702
See original permit BLDO1-114 for other inspections.
RF,nTTTRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls -plywood panels as specified in 8/31/01 letter
FINAL
Final - See Original building permit
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemti[ q BL.WI-174R-I
G .N . AT, CONDTTTONS
1. Contractors working on this project are required to have a Labor & Industries corrtractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveted
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, boldowns, sheathing, and alternate braced wall panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval r~or to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THLS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2
l
t
•
C~
Wetertnan & Katz Building
I S] Quincy Street, Suite 301
PoM1 7owe®end, WA 98366
Phone: (360) 379-3208 Faz: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-114 Issued: 6/27/01 Parcel Number: 948-302-904
Job Address: 564 14th Street Zoning: R-IH Type: VV=N Occupancy: R-3
Total Occupant Load: 3 Nature of Work: Construct single-family residence
Owner: Hometown Construction, Inc. Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @.360-417-2702
RF.(1TTTRF.D TNSPF,CTT(~NS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks. ~~ ~ ~~
%y'
///~
~Q ~j~
Footings W'w
j
~
l f y
""l
Forms
Reinforcement
Interior Footings
Porch Piers
UFER
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of A
a acnot-na
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall ,
Forms
Reinforcement
Alternate Braced Wall Panels
Positive Connection Post-to-Foundation Wall
Anchor Bolts w/ 2" x 2" x 3/16" washers
Foundation Vents - 6 required
Crawl Space Access
FLOOR FRAMING
Girders
Joists
~~~/„
/t~ ~j
Blocking ~
~~((// ~m11 1~'y
Shield under Posts l
Positive Connection
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestor @ clothes washer and
dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Whole House Fan - F-2 Bath
Source Specific Fans
Environmental Air Exhaust ducting (w/back draft
dampers), insulation (R-4) and terminus (located 3'
from opening into building)
Ca1148 hours before you dig for utility line locates.
1-800-424-5555
Page 2 of 4
Permit k BLDOI-I14
•
RRnTTTRF.D TNSPECTiONS APPROVED/DATE
FRAMING
ll
W ~Y~~~' /'-~~~ ~,11~~ 1. r
a
s
Ceilings
f'i~~~ 2 ~ ~~~ ,
Roof -Engineered LPI rafter plan to be on-site at
time of inspection
Rafter Positive Connection
Attic Venting -see code requirement sheet #77
Windows -escape
Window safety glazing
Windows Ufactor - .40 maximum
NFRC window sticker must be on windows
at inspection time
Air Seal
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 maximum
Fire Blocking
Weather Resistive Barrier
INSULATION ~ ~ J /I /1_ ~
Cam(/(G(/
~-
l~
Floor (R=30) ~/
/
_
ol
Walls (R=19) '/
Ceiling (R_38 in flat & scissor truss, RR=30 in vault)
Baffles
Vapor Barrier: low perm. paint
Crawl space - 6 mil black poly
DRY WALL NAILING / /
I
Walls ~//
/a
y
Ceilings /
Enclosed Usable Space Under Stairs
FINAL
Public Works Sign-Off
House Numbers - S "minimum
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Puvtit q BLD01-114
•
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent'properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass Tinal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Buildin¢ Department's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least .one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rn for to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.