HomeMy WebLinkAboutBLD01-113we~~an ~ xe~ Building
1 B7 Qimry Svee4 Suite 301
Port Toumue~d, WA 96368
Plwoc. (360)379-37A8 Fax: (360)385-0675
r
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-113R-1 Issued: 9/04/01 Parcel Number: 948-302-904
Job Address: 562 14th Street Zoning: R-III Type: VAN
Occupancy: R-3 Total Occupant Load: N/C
Nature of Work: Revision #1: engineered sheer walls: aer 8/31/01 letter from Tillman
Engineering 'h" alvwood sheeting on each side of wall with 8d na, 4" on the outside and lOd C~ 3" on
the inside with same holdowns is equivalent shear strength to Simpson engineered panel.
Owner: Hometown Construction, Inc.
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
GENERAL CONDITIONS APPLY -SEE LAST PAGE
•
Contractor: Same as Owner
See original permit BLDO1-113 for other inspections.
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls -plywood panels as specified in 8/31!01 letter
~//~/ /~
~(/ l
FINAL
Final - See Original building permit
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of Z
Prnnil A B6D01413R-I
G .N .RA . CONDTT'fON
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for proteMion of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection caI1385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- •
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval. prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-STTE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
P
7
Watertnm~ & Kffiz Building
] 87 Quinry $1lM, Swm 301
Port 7ounsend WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD01-113 Issued: 6/27/01 Parcel Number: 948-302-904
Job Address: 562 14th Street Zoning: R-HI Type: VV=N Occupancy: R-3
Totat Occupant Load: 3 Nature of Work: Construct single-family residence
Owner: Hometown Construction, Inc.. Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-4I7-2702
RRnT1TRF,T) TNSPE('TTONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive Ot£Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings ~ /~ f~ ~y~,,~~ ~n
/ / ~~~'1~' ~~ ll
/~//
Forms (
1C
Reinforcement
Interior Footings
Porch Piers
UFER
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
PmnitkBLDOi-113
REQUIRED INSPE('_TinNS aPPRnvRnmeTF.
FOUNDATION
Stem Wall
Forms
Reinforcement
Alternate Braced Wall Panels
Positive Connection Post-to-Foundation Wall
Anchor Bolts w/ 2" x 2" x 3/16" washers
Foundation Vents - 6 required
Crawl Space Access
FLOOR FRAMING
Girders
Joists ~ll~~ ~
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/I6" washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestor @ clothes washer and
dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Whole House Fan - F-2 Bath
Source Specific Fans
Environmental Air Exhaust ducting (w/back draft
dampers), insulation (R-4) and terminus (located 3'
from opening into building)
.J
Call 48 hours before you dig for utility line locates
i-800-424-5555
Page 2 of 4
Permit k BLDOI-1 ]3
•
REOiJIRED INSPECTIONS APPROVED/DATE
wRAMING ~~ ~, (dl/~L/ ~~~ !~('~
1~
Ceilings ~IC~~ G t 5~~~"i
Roof -Engineered LPI rafter plan to be on-site at
time of inspection
RaRer Positive Connection
Attic Venting.- see code requirement sheet #77
Windows -escape
Window safety glazing
Windows Ufactor - .40 maximum
NFRC window sucker must be on windows
at inspection time
Air Seal
Fresh Air Intake (Window Ports) ;
Doors U-Factor - .20 maximum
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R=30)
~~~ ti ~ 6~/
Walls (R-19 )
Ceiling (R-38 in flat & scissor truss, RR=30 in vault)
Baffles
Vapor Barrier: low perm. paint
Crawl space - 6 mil black poly
DRY WALL NAILING , /
Walls ~//
/~/
L~
Ceilings
i
Enclosed Usable Space Under Stairs
FINAL
Publie Works Sign-Off
House Numbers - 5"minimum
Plumbing
MechanicaUHeating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building
CaII 48 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
Permit#BLI]01-113
•
I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized.with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once constructioq is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. ContaM the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4