Loading...
HomeMy WebLinkAboutBLD01-113we~~an ~ xe~ Building 1 B7 Qimry Svee4 Suite 301 Port Toumue~d, WA 96368 Plwoc. (360)379-37A8 Fax: (360)385-0675 r CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-113R-1 Issued: 9/04/01 Parcel Number: 948-302-904 Job Address: 562 14th Street Zoning: R-III Type: VAN Occupancy: R-3 Total Occupant Load: N/C Nature of Work: Revision #1: engineered sheer walls: aer 8/31/01 letter from Tillman Engineering 'h" alvwood sheeting on each side of wall with 8d na, 4" on the outside and lOd C~ 3" on the inside with same holdowns is equivalent shear strength to Simpson engineered panel. Owner: Hometown Construction, Inc. SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 GENERAL CONDITIONS APPLY -SEE LAST PAGE • Contractor: Same as Owner See original permit BLDO1-113 for other inspections. REQUIRED INSPECTIONS APPROVED/DATE FRAMING Walls -plywood panels as specified in 8/31!01 letter ~//~/ /~ ~(/ l FINAL Final - See Original building permit Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of Z Prnnil A B6D01413R-I G .N .RA . CONDTT'fON 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection caI1385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- • residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval. prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-STTE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 P 7 Watertnm~ & Kffiz Building ] 87 Quinry $1lM, Swm 301 Port 7ounsend WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD01-113 Issued: 6/27/01 Parcel Number: 948-302-904 Job Address: 562 14th Street Zoning: R-HI Type: VV=N Occupancy: R-3 Totat Occupant Load: 3 Nature of Work: Construct single-family residence Owner: Hometown Construction, Inc.. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-4I7-2702 RRnT1TRF,T) TNSPE('TTONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Ot£Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings ~ /~ f~ ~y~,,~~ ~n / / ~~~'1~' ~~ ll /~// Forms ( 1C Reinforcement Interior Footings Porch Piers UFER Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 PmnitkBLDOi-113 REQUIRED INSPE('_TinNS aPPRnvRnmeTF. FOUNDATION Stem Wall Forms Reinforcement Alternate Braced Wall Panels Positive Connection Post-to-Foundation Wall Anchor Bolts w/ 2" x 2" x 3/16" washers Foundation Vents - 6 required Crawl Space Access FLOOR FRAMING Girders Joists ~ll~~ ~ Blocking Shield under Posts Positive Connection Girder to Concrete Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/I6" washers PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestor @ clothes washer and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan - F-2 Bath Source Specific Fans Environmental Air Exhaust ducting (w/back draft dampers), insulation (R-4) and terminus (located 3' from opening into building) .J Call 48 hours before you dig for utility line locates i-800-424-5555 Page 2 of 4 Permit k BLDOI-1 ]3 • REOiJIRED INSPECTIONS APPROVED/DATE wRAMING ~~ ~, (dl/~L/ ~~~ !~('~ 1~ Ceilings ~IC~~ G t 5~~~"i Roof -Engineered LPI rafter plan to be on-site at time of inspection RaRer Positive Connection Attic Venting.- see code requirement sheet #77 Windows -escape Window safety glazing Windows Ufactor - .40 maximum NFRC window sucker must be on windows at inspection time Air Seal Fresh Air Intake (Window Ports) ; Doors U-Factor - .20 maximum Fire Blocking Weather Resistive Barrier INSULATION Floor (R=30) ~~~ ti ~ 6~/ Walls (R-19 ) Ceiling (R-38 in flat & scissor truss, RR=30 in vault) Baffles Vapor Barrier: low perm. paint Crawl space - 6 mil black poly DRY WALL NAILING , / Walls ~// /~/ L~ Ceilings i Enclosed Usable Space Under Stairs FINAL Publie Works Sign-Off House Numbers - 5"minimum Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building CaII 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Permit#BLI]01-113 • I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized.with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once constructioq is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. ContaM the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4