Loading...
HomeMy WebLinkAboutBLD01-112Watemtan 8e Katz Building 781 Qtinry S1reeS Swte 307 Port Tounseod, WA 98368 Phone: (360)379-3208 Faa: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT. & INSPECTION RECORD Il THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-1128-1 Issued: 9/04/01 ° Parcel Number: 948-302-904 Job Address: 568 14th Street Zoning: R-III Type: V;N Occupancy: R-3 Total Occupant Load: N/C Nature of Work: Revision #1: engineered sheer walls: per 8/31/01 letter from Tillman Engineering, 'h" ulywood sheeting on each side of wall with Sd Cad 4" on the outside and lOd (7a, 3" on the inside with same holdowns is equivalent shear strength to Simason engineered panel. Owner: Hometo»tn Construction, Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REpUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 • See original permit BLDO1-112 for other inspections. REQUIRED INSPECTIONS APPROVED/DATE FRAMING Walls -plywood panels as specified in 8/31/01 letter ~~jG FINAL Final - See Original building permit • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pttmitk BLDOI-1728-1 fTF.NF,R A i . :ONDTCIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner ar owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- • residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done. by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig Tor utility line locates I-800-424-5555 Page 2 of 2 CITY OF PORT TOWNSEND Wa~aman & Katz Building IBI Quincy Street, Suite 301 PM Towreend, WA 98368 Phone: (360) 3794206 Fax: (360) 3B6-7676 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-112 Issued: 6/27/01 Parcel Number: 948-302-904 Job Address: 568 14th Street Zoning: R-III Type: V_N Occupancy: R-3 Total Occupant Load: 3 Nature of Work: Construct single-family residence Owner: Hometown Construction. Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings ~~~~~ ~ ~ /J %~ ~' ~ "" ~ 1 // Forms ~ Reinforcement Interior Footings Porch Piers ~~9~(/0 Ca1148 hours before you dig for utility line locates -- 1-800-424-5555 Page 1 of 4 r~exs~.~o~-iii REQUIRED INSPECTIONS aPPRnvFnmaTF FOUNDATION Stem Wall Forms Reinforcement Alternate Braced Wall Panels Positive Connection Post-to-Foundation Wall Anchor Bolts w[ 2" x 2" x 3/16" washers Foundation Vents - 6 required Crawl Space Access FLOOR FRAMING Girders Joists ~ Blocking ~~ ~ Shield under Posts Positive Connection Girder to Concrete Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers .PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestor @ clothes washer and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan - F-2 Bath Source Specific Fans Environmental Air Exhaust ducting (w/back draft dampers), insulation (R-4) and terminus (located 3' from opening into building) ,J Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 PertnitM LD01-1 C~ i REQUIRED INSPECTIONS APPROVED/DATE FRAMING ,. ~1 ~p {~~ 1~~1`1'/ t~ ~~ ~'~~ Walls , Ceilings ~"~I3?,~ C~ <<~~~7`I~'}c pS,~ `" ( ' Roof- Engineered LPI rafter plan to be on-site at time of inspection Rafter Positive Connection Attic Venting -see code requirement sheet #77 Windows -escape Window safety glazing Windows Ufactor - .40 maximum NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .20 maximum Fire Blocking Weather Resistive Barrier INSULATION Floor (R_30) ~~ ~ ~ ~ ~~0~ Walls (R=19) - Ceiling (R=38 in flat & scissor truss, R=30 in vault) Baflles Vapor Barrier: low perm. paint Crawl space - 6 mil black poly DRY WALL NAILING Walls ` ~l5"~0( Ceilings Enclosed Usable Space Under Stairs FINAL Public Works Sign-Off House Numbers - 5 "minimum Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Pmnit # BA]01-I11 • 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work msy result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shalt be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required Public Works auaroval must be received prior to scheduling the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit aMive. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig Tor utility line locates 1-800-424-5555 Page 4 of 4