HomeMy WebLinkAboutBLD01-107Walersnan & Katz Building
181 Quincy Street Suite 301
Port Towfscend, WA 98368
Phone (360) 379-3208 Fax (360) 385-7675
J
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-lO7R-2 Issued: 08/23/01 Parcel Number: 957 900 402
Job Address: 802 27`h Street Zoning: R-II Type: VAN
Occupancy: RR=3 Total Occupant Load: No Chance
Nature of Work:
Owner: John Reichard na~}-`Yut'~ SContr cto~ Game'as~lOwr7er ~ t Z`(t,.q) ~
GENERAL CONDITTONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
RFCIiTiRFiI 7NCPF.CTiC1NS APPRnVF,D/nATF.
See also original Inspection Record for additional
required inspections
FRAMING
Loft Floor Framing
Cantilever
Beams
Wall O w
t)3
Post to Rafters '~~
S
Windows - .40 or better
Loft Escape Window
Guardrails
DRYWALL NAILING
Walls
Ceiling
FINAL - refer to original inspection record
Call 48 hours before you dig for utility line locates 1
I-800-424-5555
Page 1 of 2
Building Pemtit #BLDOI-107R•2
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of si{t fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection call 385-2294; a
minimum of twenty-tour hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done,by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval. prior to making changes in the field. Contact the Building
Department at 379-5086 rior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates 2
1-800-424-5555
Page 2 of 2
--- ~ _._ a
U
Waterman & Katz Building
181 Quincy Street Suite 30t
Port Townsend WA98368
Ptwne (360) 379-3208 Fax (360) 383-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number. BLDO1-1 O7R-1 Issued: 07/24/01 Parcel Number: 957900402
Job Address: 802 27'~ Street Zoning: R-II Type: VV=N Occupancy: RR=3
Total Occupant Load: NC Nature of Work: Add foundation criuule wall to stem wall; revise
Birder and ridee board
Owner: John Reichard Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTTTRFI) TNSPF(".TTnNS
APPROVED/DATE
See also original Inspection Record for additional
required inspections
FOOTINGS
Interior Footing ~~~~
0 ~
Reinforcement
FOUNDATION ~/J ~~
Cripple Wall Y~~ C
Blocking
Sheathing
FLOOR FRAMING
Girders ~/ /~ 6 l ~ ~J
C~
Joists
Blocking
Shield under Post
Positive Connections
Girder to Concrete
Post to Foundation Wall Connection
Treated Wood to Concrete
Anchor Bolts & Washers
Call 48 hours before you dig for utility line locates 1
I-800-424-5555
Page 1 of 2
Building Pemilt #BLDOI-107R-1
FINAL - refer to original inspection record
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 3852294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns; sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all debciencies noted-
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utiGty_Ii~le locates
1-800-424-5555
Page 2 of 2
R
1
Walertnan & Katz Building
181 Quincy Street Suite 301
Port TowTSnd, WA98368
Phone (360) 379-3208 Fax (360) 383-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BL.D~1-107
Job Address: 802 27'" Street
Issued: 06/01/01 Parcel Number: 957900402
Zoning: R-II Type: VV=N Occupancy: RR=3
Total Occupant Load: 2 Nature of Work: New Single-family Dwelling
Owner: John Reichard Contractor: Samenas Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE 1' • ~ ' ~ ~~7~~
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.(1TTTRET) TNSPRCTTnNS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat per details attached
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Interior Footings
Deck Piers
UFER
FOUNDATION
Stem Wall ~ ~j~
'f,~
Forms ~~
~~
// ("
J/
Reinforcement (
!!
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents - 5 required
Crawl Access
Beam Pockets
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
1
Building Pmnit #BI.DOI-I07
REQUIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING
Girders '
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
-Post to Foundation Wall Connection
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING:
Rough-In (D-V-T & Clean Outs)
Water Supply
Gas Supply
Water Hammer Arrestor
Hose Bibs (backflow protection. required)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi j3. 03
~"
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior
MECHANI
House Ventilation bath
Z{itchen Fan
Environmental Air Exhaust ducting (with
backdraft damper, insulation (R-4) and terminus
'
S j 3' o~
(located 3
from opening)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
•
2~
Building Pemtit #BI.DOl-107
RF(1TTTRF.n TNSPF,('.TTnNS APPROVED/DATE
•
FRAMING ---- -- - - -
Walls
Roof
Attic Venting -ridge & eave
Ceilings
Posts, beams & headers
Rafter Positive Connection
Windows -egress _ ~t~/
Windows -safety glazing (SGD) (
.
~
/
/
Windows Ufactor - .40 or better (11
///
~~~
I
,0 3
~
NFRC window sticker must be on j. 1
windows & doors at inspection time
Air Seal
Fresh Air Intake -wall ports
Doors Ufactor -.40 or better
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-25) _- A
Wall (R-19) '
~L -
(
Ceiling (R-30 )
B
ffl ~
1
~
a
es
i
i , !(o.
~'
Vapor Barr
er: pa
nt ,
Crawl space - 6 mil black poly
DRY WALL NAILING
i ~k'--~~ ~1~`1~C3
ling
Ce
FINAL
Public Works Sign-Off
House Numbers - 5"minimum
Plumbing
Mechanical/fieating
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Pemtit NBLDOI•]07
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior fo cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
4~