HomeMy WebLinkAboutBLD01-103Waterman & Katz Building
181 Quincy Street Suite 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
PERMIT AND INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2626 for Inspection
Permit Number BLD01-103 Issued 5/21/01 Parcel Number: 101351001
Job Address Building 502 Harbor Defense Way Zoning P/OS Occupancy E-2/A-3
Nature of Work Install Fire Alarm System Use of Building Marine Science Center
(This is the Marine Science Center building on land, not over the water./
owner Washington State Parks Contractor Federal Fire Safety, Inc.
~ * * * Cun ntt~nhnA F:rn nnn~rfmcnt mourn irafcr! ~/1!i/n 1 * *' ~ ~
Site Inspection Inspector
Date
System Tests Inspector
Date
Contractor's Material & Test Certificate Inspector
Date
As-Built Plans filed with Owner & Plan Box Inspector
na, FACP (24 x 36 maximum format) Date
Inspector
Date
Fire Department Final Inspection Approval Inspector
Date
\1Citypdc\shappslTtipslPermits\Ol PERMrfS\O1-103alarm.doc
Pemtit ~ ELD01-103
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Owner or owner's agent shag review and oversee correction of any and all deficiencies noted by required
inspections.
3. Re-inspection is required after inspection report corrections are completed.
4. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required Public Works approval must be received Drior t0
scheduling the BuUlding Department's final inspection.
5. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
6. All building permits expire if no progress has been made within six months, or if no inspections are done by
the Building Department within one year. Call for at least one inspection per year to keep your building
permit active.
7. Revisions require submittal & approval prior to making changes in the field. ContaM the Building
Department (g~ 379-3208 prior to making changes to the approved plans.
S. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. •
1\Citypdc\shapps\Trips\Permita\01 PERMITS\01-103alatm.dce
• '' < pOPT TO
~p~NeatW PIRP City of Port Townsend ;op ~,~
g ~ ~ ~
Fire Department ~ o
.,:
' ~~¢
Fire Protection Svstem Inspection Checklist:
Automatic Fire Alarm Svstem
General
Alarm System Permit No.:
BuildingPermitNo.: BLnO/-/~~
Facility Address: Bc.d OL .~ GVO-c~Qr-,/
Facility Name: ~l92 ~-Q--~"
Svstem:
M nual Automatic ^ Voice O Monitored ? ^ Graphic ^ Stand Alone
Elements:
Heat ^ Rate of Rise ^ Smoke ^ Horn C~Horn/Strobe ^ Strobe
^ Coiling Door /. C3'Manual Pulls ^ Egress Control
Contractor's State License [&NICET]: chc ,~y(C Inspector Int. & Dt • U~ 2%Vl
Plan Review Inspector Int. & DtC/~
Cil' Plans Received [date: ~G ~ ]
G1 Mfr. Specifications of individual elements
® Floor Plan(s) complete
Ca, Battery Calculations, wring types and sizes.
Power connection, Emergency Power Source
. Site Insaection Inspector Int. & D f o~ ,c~
~ System installationllocation check-off
p~ Panel Location
^ Remote Annunciation
l3 Access Keys
1~ Labeling
~ Operating Instructions.
^ Tools
Svstem Test(s) / Lnspector Int. & Dt.:'f+ ~ 7 3S•Q(
~ Heat ^ Rate of Rise ^ Smoke ^ Horn H Horn/Strobe
^ Egress Control Fa'R4anual Pull-station ^ Strobe
^ Monitoring Agency Test _ ^/////Emergency Power Source
^ Fire Alarm System Inter-tie with Sprinkler System Test (Tamper): ~5ecs.
Contractor's Material & Test Certificate: Inspector Int. & Dk: ~~.264~
As-Built PlansAnstructions in Plan Box (u) FACP: Inspector Int. & Dt.:
Monitorine Aeencv
Name: TBD
Address:
Contact Number:
Account Number:
Panel Reset Code
. Code Number: n:.+ ~ +n6 '>pF
Fire Deaartment Aoaroval
Inspector: f) ~'mOCtc '73'Y1~7
Date: G~--yam-~1
. Filed wBldg. Official: b~' 2/~' d f
C:\TOm's File Cabinet\Forms & Templates\Fre Alarm Sysrem\Fire Alarm System Inspection Checklist.doc 7/25/01