HomeMy WebLinkAboutBLD01-102Building and Community Development
Walemtan & Katz Building
1 SI Quincy Sweet Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD !
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection ~'
Permit Number: BLDO1-lO2 Issued: OSi21/Ol Parcel Number: 955900014
Owner/Contractor: Hamilton Hei>!hts LLC Installer: Kozeliskv's Home Services WAINS0626
Job Address: Lot 14; 2202 Rainier Street Zoning: PUD Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 4/2 Nature of Work: Set Manufactured Home with attached site-built earaee
and aorch.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
* **Hours of Construction are limited to 7:30 a. m. to 6: 00 p. m. Monday through
Friday and prohibited on weekends and national holidays***
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT
CONTROL
See details attached to MIP and general condition #2
Silt Fence
Drive OffMat
SLAB/CONCRETE ydttAt~ S/Z ~O/
"
Setbacks l
Forms
Monolithic Slab/Foundation (gazage)
~`O~~ ~//~~D/
Reinforcement
Anchor Bolts
Alternate Braced Wall Panel Holdown Hazdwaze
RE UIRED INSPECTIONS
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit # BLDOI.102~ ~'
REQUIRED INSPECTIONS APPROVED/DATE
PLUMBING (prior to skirting)
Water Supply -Main shut-off valve (port or ball valve)
installed in water supply piping prior to connection to home,
~l S(D j ~ ' ~J
min. '/, "diameter, same as supply pipe r ~,
Pressure Reduction Valve if > 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 ps.i. for IS minutes
Pressure relief valve drain - to exterior of skirting, exhaust
dawmvard between 6"and 24"above ground
Drainage Piping -sloped min. '/s"per foot
MECHANICAL (prior to skirting)
Ducts & Duct Insulation
/, / ~/~yj ~n
Dryer Exhaust -vented to outside. Extension into crawl space ~f ( (~~ ( V/
requires venting through skirting with no dips; follow dryer
manufacturer's instructions; total combined length of ducting
not to exceed 14' w/ 2-90° elbows
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per ~ r ~~6
l(
manufacturer's installation manual; clearance of 18"min. from
lowest point of I-beam and the ground or footing for min. of
75% of area under home w/ 12 "min. elsewhere unless
installation manual specifres; otherwise area around home
graded to provide runoff away from home.
FRAMING:
Engineered roof truss plan to be on-site at time of inspection
~~ ~
~ /
Walls ~
Alternate Braced Wall Panels
Header
Roof
Garage/House Attachment
DRY WALL NAILING
Garage/House Occupancy Separation with 20 minute
Z~~d~
self-closing door l
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
Pemtit # BLD01-102
FINAL
• Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Final -Building
No holes or gaps greater than %, "allowed
in skirting. Skirting to be rated for contact with
earth if backfill is involved.
Crawl space ventilation per installation
manual @ 1 sq. ft./I50 sq. ft. (9 req'd.); located
close to corners, on at least two opposing sides
for cross ventilation.
Crawl space access must provide access to
all areas under home; minimum IS"x 24"
unless specified otherwise; covered with vinyl,
pressure-treated wood or metal.
~z~~ ~
~~b,~6/
GENERAL CONDITIONS
• 1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a Ci business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils eaposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, p-antings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and- all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
Call 48 hours before you-dig for utility line locates
I-800-424-5555
Page 3 of 4
Pem~ii# BLSl01dQ2~ ~~ ~
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep yo
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4