Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD01-100
f Wam~men&Ratz BUtWvg 18l Qui~S 84xt, Suite 301 Pott Tomueend. WA 98368 Phom:(360)379-3208 Fex: (360)385-7675 CITY OF PORT TOWIVSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-lOO Issued: 5/24101 Parcel Number: 951 909 801 Job Address: 3220 Lands End Lane Zoning: R-I Type: V_N Total Occupant Load: 312 Occupancy: R-3 /U-1 Nature of Work: Construct studio with attached earase Owner: Peter Boechenstein & Anthon Prud'homme Contractor: Little & Little Construction ****All elements of engineering including holdowns, shear wall details, nailing and other engineered connections require inspection prior to cover**** GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 •RF.l1TTTRF,II TNCPFf'TTnNS APPROVED/DATE TEMP EROSION & SDM'T CONTROL i See General Condition No. 1 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~j~~/~~ Footings ~"/ Forms Reinforcement -grade 60 steel per structural notes ~o O ~ ~'L~47 Irate 'or Footings vvv Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 r~~aBtmiaao -- REQUIRED INSPECTIONS APPROVF.n/nA TF. FOUNDATION Stem Wall Forms Reinforcement -grade 60 steel per structural notes ~ ~ ~/ ~ / ( Anchor Bolts & Washers -see shear wall schedule, sheet 5 1 Vents - required @ 1/150 far enclosed under-floor area Crawl Access Beam Pockets Engineered Holdowns FLOOR FRADRIVG Joists ~ ~ ~ (5~ ~ ~ Girders Radiant Heat Tubing Blocking Shield under Posts Positive Connections Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts and Washers PLUMBING: Rough-In (D-V-T & Clean outs) j DI ~ 5(6 Water Supply Gas Supply Hose Bibs (backflow protection required) i e nsu Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, termi to 6" - 24" above ground ECHANICAL Boiler installation instructions shall be on-site at ection Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), ~„//g/d~ nr t/~' (~ insulation (R-4) and terminus (located 3' from opening) =. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page2of4 Pmeit # BLD01-100 RF.nTTTRF.II TNSPECTTnNS APPROVED/DATE RANTING: --- -- - - ells ~O/~, j/©~ Engineered shear walls Engineered Straps and Connections Treated Wood to Concrete Engineered Posts, Beams & Headers - 6" x 6" DF #1 posts per structural notes 77rru-bolts @ beam/floor & beam/post Ceiling/Roof Rafter Positive Connection Roof Venting -ridge Windows -safety glazing Windows U-factor - .45 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Doors U-factor - .40 or better Fire Blocking Weather Resistive Barrier INSULATION , . / ~%9~ f ~ oor-(R=19) a4:(/'' ;' ~ ~`.." ' lam/ ~! ails-(R=19) Ceiling - (R=25 ) Baffies Vapor Barrier required 6 mil black poly in crawl space DRY WALL NAII,ING ~/ / ~ j~~ / Walls ~ ~ , Ceiling , Garage/House Occupancy Separation FINAL House Numbers - 5" Z/~ ""~0~ ' Plumbing ) (~ MechanicaUHeating / Insulation Certificate Vapor Barrier Paint Certificate (if applicable) Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduline the Building Departments final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done 6y the Building Department within one .year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THI5 PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4