Loading...
HomeMy WebLinkAboutBLD01-099Waterman &. Katz 187 Quincy Stael Suite 301 Part Townu~, WA 98368 Phone (360) 37&3208 Fex (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-O99 Issued: 05/18/01 Parcel Number: 931403401 Job Address: 207 Cherry Street Zoning: R-II Type: VV=N Occupancy: R-3 Total Occupant Load: No Chance Nature of Work: Construct oert:ola on existine deck and attach_to house and railine. Owner: Gre¢orv Getch Contractor: Owner GENERAL CONDTTIONS APPLY -SEE LAST PAGE CJ • RF.OiTiRF.D INSPECTIONS APPROVED/DATE FRAMING NOTE: Ald framing members exposed to weather to be pressure treated, wood ojnatural resistance to decay or treated with Woodlife Class II/Kop Koat preservative Posts & Beams Ledger 3oists Hangers Positive Connections Blocking INAL House Numbers posted (min. 5'~ / ~~ Smoke Detectors throughout existing construction per 1997 ~~~/ UBC; battery powered okay 111 Pergola -Final Call 48 hours before you dig for utility line locates: 1-800-024-5555 Page 1 of 2 Permit p BLll01-099 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept Tree of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass fmal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to • scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. u Celt 48 flours before you dig for utility line locates: 1-800-424-5555 Page 2 of 2