Loading...
HomeMy WebLinkAboutBLD01-097Waterman & Katz Building 781 Quinry Street, Sw1e 301 Port Towaseod WA 983fi8 Phone: (360)379-3208 Fez: (360)365-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-O97 Issued: 5/22/01 Parcel Number: 968-500-029 Job Address: 4191 Jackman Street Zoning: PUD/R-II Type: VV=N Occupancy: R-3/IJ-1 Total Occupant Load: 6/2 Nature of Work: Construct sinele-family residence with attached earaee Owner: Llovd & Lunette Campbell Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 **Hours of construction limited to 8:00 a.m. to 6:00 p. m. Monday through Friday •and prohibited on Saturdays, Sundays, and National Holidays. ** RFnT]TRF,1) TNSPF.('TTONS APPROVED/DATE CLEARING/GRADING Tree removal prohibited for live trees at 6" diameter at breast height or more which are located greater than 10 feet from building pad. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS ~,~~ s~~ Setbacks GG Footings Forms Reinforcement Interior Footings Porch Piers LIFER Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 PmoitNBLD01-097 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms 1~0(;65~ ~~~ Reinforcement Beam Pockets /' Anchor Bolts w/ 2" x 2" x 3/16" washers l~ ~~Zfll~ ~ ~n l.~ Foundation Vents - 7 required Crawl Space Access FLOOR FRAMING Girders /,~/„ G Joists ~ ~f' / Y' Blocking. l Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers Crawl Space Access PLUMBING: Rough-In (D-V-T & Clean outs) r Water Supply ~ ~ ~- ~ I ~ ~ Water Hammer Arcestor @ clothes washer and 111 dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan -Utility Room Source Specific Fans ~ f ~~ I©1 r l( Environmental Air Exhaust ducting (w/back draft dampers), insulation (R-4) and terminus (located 3' from opening into building) C~ Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 Prnuit ri BLDO7-097 RF.niJiRED INSPECTIONS APPROVED/DATE FRAMING Walls ~f /Z ~ /~ "Ceilings / G`/ Roof Truss Positive Connection Attic Venting -gable end and eave Windows -escape Window safety glazing Windows Ufactor - .40 maximum NFRC window sticker must be on windows & skylights at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .20 maximum Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30) ~2~~~/ Walls (R_19) Ceiling (R-38 in flat & scissor truss, R-30 in vault) Baflles Vapor Barrier. low perm. paint Crawl space - 6 mil black poly DRY WALL NAILING Walls Interior Braced Wall Panels Ceiling Garage/Ilouse Occupancy Separation Enclosed Usable Space Under Stairs DRAINAGE Tie-in with Lynnesfield master detention system LANDSCAPING Planting of one street side tree required at corner of Lot 29 per PUDA condition #44(f) FINAL (continued on neat page) Public Works Sign-Off House Numbers Plumbing MechanicaUHeating Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit#BLDOI-am - FINAL (continued) Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building 1. Contractors working on this projeM are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works anoroval must be received prior to scheduling the Building Department's Snal inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made wkhin six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4