Loading...
HomeMy WebLinkAboutBLD01-091Wa[ermav & Kati BW[dMg 181 QuMcy Street,SWte 301 Port Tomeevd, WA 98365 Phone: 360-3793208 Pea 360355-7fi75 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-229 4 for Inspection Permit Number: $LDO1-O91 Issued: OS/09/01 Parcel Number: 999100159 Job Address: 21'73 Victoria Avenue Zoning: Towne Point PUD Type: VV=N Occupancy: UU=1 Total Occupant Load: 1 Nature of Work: Construct Detached Carport for SFR Owner: Lois McCally Contractor: Ravenswood Carpentry. Irv Mortensen. 360-683-3441 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702 RFlliTii2FTl TN.CPF(`Ti(1NC APPRnVF.TI/iIATF, TEMP EROSION & SDM'T CONTROL Drive Off Mat as needed during construction to prevent tracking of dirt and debris onto City rights-of--way See General Condition #2 FOOTINGS Setbacks ~~ „>~ ///f ~/ (., f~ Footings ( 7 Per attached engineering, p. 3 of structural talcs Forms Reinforcement Call 48 hours before you dig for utility line locates 1-800-4245555 Page 1 of 3 Building Permit #01-091 REQUIRED INSPECTIONS APPROVED/DATE FRAMING: - - ---- Walls -pressure treated 6" x 8" HF #1 Positive Connection Post-to-Pier Post-to-Beam Connection Engineered Beams: Roof- engineered truss plan to be on-site at time of inspection Truss Strapping - LSTA 1 Seismic Tie (e.g., HI) each truss-to-beam Engineered Sheathing FINAL _ /~ House Numbers -minimum 5" ~ /„~ / '~ ( J Final -Building ~~ 1 " l V ~('(( GENERAL CONDTl'IONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to • work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing end graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Building Permit N01-091 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. 10. Revisions require review and approval prior to making changes to the approved plans. Contact the Building Department at 379-3208 prior to making changes to the approved plans. L_J Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 3 4 4 ,~ •