HomeMy WebLinkAboutBLD01-090
Waterman & Katy Building
181 Quinry StrM. Suite J01
Porl7o.vnaend, WA 98J6S
Phone: 360-379J208 Faa J60-b85-1675
CITY OF PORT TOWNSEND
C~
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $LD~1-~9~
Job Address: 1921 31" Street
Issued: 05/10/01 Parcel Number: 972600505
Zoning: RR=II Type: VV=N Occupancy: RR=3
Nature of Work: New Single-family Dwellin¢
Total Occupant Load: 2
Owner: Earl Bovsen
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
R7i (1TTTRTi Tl TNCPFf TT(1N.C
A PPR n VF.TI/1)A TF,
TEMP EROSION & SDM'T CONTROL -Erosion
control measures to be inspected by Alex Angud, Public
Works, prior to any clearing or grading activity per ESA
condition #9
See General Condition #2 and conditions of
Deering ESA permit #9605-OS (attached)
Silt Fence as needed
Drive Off Mat per details attached to SUDP
ESA PRE-CONSTRUCTION MEETING
Owner shall schedule an ESA pre-construction meeting with
the BCD Director prior to any clearing or grading activities
on the site. The Director shall approve the freld markings of
the buildable area in relation to the wetland buffer prior to
any construction activity.
FOOTINGS
Setbacks
Footings
j~~~ / ~~~
``~7``~~ `//
Forms
Reinforcement
Interior Footings
Porch Piers
`~,
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Building Pem~it #BLD01-099
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wa[I
Forms
~/l~Q~
Reinforcement Ir
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents - 4 required
Crawl Access
Beam Pockets
SLAB - N/A
FLOOR FRAMING
Engineered BCI plan to be on-site @ time of inspection
l ~
n~
.
Girders ~
~
/ ("
/f
Joists [
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING:
Rough-In (D-V-T & Clean Outs)
~ I ,01 ~r,~
Water Supply ~ ~
l V
Water Hammer Arrestor
Hose Bibs (backflow protection. req'dJ
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior
MECHANICAL
Whole House Ventilation @ bath
~/Z ~/~~
Kitchen Fan ` I•
Environmental Air Exhaust ducting (with
backdraft damper, insulation (R-4) and terminus
(located 3' from opening)
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit #BLDOI-090
r • RE UIRED INSPECTIONS APPROVED/DATE
•
FRAMING
Walls ~~~ ~~~~
Roof -Engineered truss plan to be on-site at
time of inspection
Attic Venting -gable & soffrt
Ceilings
Posts, beams & headers
Truss Positive Connection
Windows -egress
Windows -safety glazing (SGD)
Windows Ufactor - .40 or better
NFRC window sticker must be on
windows & doors at inspection time
Air Seal
Doors Ufactor - .20 or better
Fire Blocking
Weather Resistive Bamer
INSULATION ~ ~~)) .~1 `J
~ ~
~
~~
Floor (R-30) f~Q
~
l
j ~
Wall (R-19)
Ceiling (R-38 )
Baffles
Vapor Bamer: paint
Craw] space - 6 mil black poly
DRY WALL NAILING
Walls >~/// /~ ~
/ ~
/( G
Ceiling G
FINAL
Public Works Sign-Off
House Numbers - 5 "minimum
Plumbing
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors //
Final -Building '
~ ~ yam/
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Pemit #BI.DOI-04Y -
• i ._
1
i~
GENERAL CONDTITONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall. review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Publie Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4