Loading...
HomeMy WebLinkAboutBLD01-090 Waterman & Katy Building 181 Quinry StrM. Suite J01 Porl7o.vnaend, WA 98J6S Phone: 360-379J208 Faa J60-b85-1675 CITY OF PORT TOWNSEND C~ CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: $LD~1-~9~ Job Address: 1921 31" Street Issued: 05/10/01 Parcel Number: 972600505 Zoning: RR=II Type: VV=N Occupancy: RR=3 Nature of Work: New Single-family Dwellin¢ Total Occupant Load: 2 Owner: Earl Bovsen Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 R7i (1TTTRTi Tl TNCPFf TT(1N.C A PPR n VF.TI/1)A TF, TEMP EROSION & SDM'T CONTROL -Erosion control measures to be inspected by Alex Angud, Public Works, prior to any clearing or grading activity per ESA condition #9 See General Condition #2 and conditions of Deering ESA permit #9605-OS (attached) Silt Fence as needed Drive Off Mat per details attached to SUDP ESA PRE-CONSTRUCTION MEETING Owner shall schedule an ESA pre-construction meeting with the BCD Director prior to any clearing or grading activities on the site. The Director shall approve the freld markings of the buildable area in relation to the wetland buffer prior to any construction activity. FOOTINGS Setbacks Footings j~~~ / ~~~ ``~7``~~ `// Forms Reinforcement Interior Footings Porch Piers `~, Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Building Pem~it #BLD01-099 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wa[I Forms ~/l~Q~ Reinforcement Ir Anchor Bolts w/ 2" x 2" x 3/16" square washers Vents - 4 required Crawl Access Beam Pockets SLAB - N/A FLOOR FRAMING Engineered BCI plan to be on-site @ time of inspection l ~ n~ . Girders ~ ~ / (" /f Joists [ Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers PLUMBING: Rough-In (D-V-T & Clean Outs) ~ I ,01 ~r,~ Water Supply ~ ~ l V Water Hammer Arrestor Hose Bibs (backflow protection. req'dJ Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior MECHANICAL Whole House Ventilation @ bath ~/Z ~/~~ Kitchen Fan ` I• Environmental Air Exhaust ducting (with backdraft damper, insulation (R-4) and terminus (located 3' from opening) • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Permit #BLDOI-090 r • RE UIRED INSPECTIONS APPROVED/DATE • FRAMING Walls ~~~ ~~~~ Roof -Engineered truss plan to be on-site at time of inspection Attic Venting -gable & soffrt Ceilings Posts, beams & headers Truss Positive Connection Windows -egress Windows -safety glazing (SGD) Windows Ufactor - .40 or better NFRC window sticker must be on windows & doors at inspection time Air Seal Doors Ufactor - .20 or better Fire Blocking Weather Resistive Bamer INSULATION ~ ~~)) .~1 `J ~ ~ ~ ~~ Floor (R-30) f~Q ~ l j ~ Wall (R-19) Ceiling (R-38 ) Baffles Vapor Bamer: paint Craw] space - 6 mil black poly DRY WALL NAILING Walls >~/// /~ ~ / ~ /( G Ceiling G FINAL Public Works Sign-Off House Numbers - 5 "minimum Plumbing Insulation Certificate V. B. Paint Certificate Smoke Detectors // Final -Building ' ~ ~ yam/ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Pemit #BI.DOI-04Y - • i ._ 1 i~ GENERAL CONDTITONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall. review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Publie Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4