HomeMy WebLinkAboutBLD01-087
Waterman & Katz Building
187 Quincy Street, Suite 301
PM 7owmn~d WA 98366
Phone: (360) 379-3208 Fax: (360) 365-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LD~1-~g7
Job Address: 1528 Adams Street
Nature of Work: Construct New Foundation
Owner: Dorothy Reedy
Issued: 5/14/01 Parcel Number: 974100204
Zoning: RR=II Type: VV=N Occupancy: R-3
Occupant Load: N/C
Contractor: Dave Johnson Construction.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: FOUNDATIONPERMIT ONLY
ATi l1TTTi?Ti Tl TNCPF("TTf1N.C
APPRIlVFT1/1)ATR
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2 -install on-site as needed
during construction to prevent sediment from leaving the
' site and to eliminate tracking of soil onto the street
FOOTINGS ~-/z ~ /~
Setbacks y' l,'
Footings /
Forms
Rei orcement
R M~
FOUNDATION
Stem Wall
s/~~
Forms
Reinforcement /~
Anchor Bolts w/ 2" x 2" x 3/16" square washers ~/~~/~~/' !/
"
Vents 6
~
Crawl space access
Treated Wood to Concrete
6 mil black poly; lap seams 12"
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
rya a aino~-orr
FINAL
House Number -check for 5" numbers
Smoke Detectors required throughout existing.
house per 1997 UBC: one in each sleeping room
and in each area hallway leading to each sleeping
room with a minimum of one detector on each floor
Final -building
t~/Zs~er ~Q
GENERAL CONDITIONS
I. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within sia months, or if no inspections are done
by the Building Department. within one year. Call for at least one inspection per year to keep your
building permit active.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3