HomeMy WebLinkAboutBLD01-086City of Port Townsrnd
Waterman & Katz Building
I81 Quincy Street, Port Townsend, WA 98368
(360)379-3208 Faz (360)379-6923
CITY OF PORT TOWNSEND
r1
LJ
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLT)OI-086 Issued: 4/27101 Parcel Number: 931401201
Job Address: 811 E Street Zoning: R_II Type: VV=N
Occupancy: R-3/U-1 Total Occupant Load: 4
Nature of Work: New arbor at front entry and over eara¢e entry.
Owners: Gail Bernhard and Jean Walat Contractor: Trillium Construction
(385-1105)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF,nTTTRF.D TNSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks
Post Footings
Reinforcement
Post Base ~' ~ - - ~ '
+!'>>I,<','~. ~/',~ ~ _ ,'1 1. ~ i-= c ;' ,.. _,
~~'/ ~!? ~~
'
FRAMING
All engineered elements require inspection prior to
cover
Walls
Beams
Knee Brace
Lag Screws
Posts to Beam connection
Roof
FINAL
"
minimum
House Numbers - 5 J~/Z S~
~
Smoke Detectors throughout existing construction /
'"1
per 1997 UBC
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
~~
Pertni[ # BLDO1-086
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business License. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294.
A minimum of twenty-four hours notice is required. Public Works approval must be received
prior to scheduling the Building Departments final inscection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora •
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2