Loading...
HomeMy WebLinkAboutBLD01-084Watemim&Katzauilding 181 Quinq Street, Suite 301 Pat ToNaseml, WA98368 Phone: (360)379-3208 Fa¢'(360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-OH4R-2 Issued: 08/02/01 Parcel Number: 985201002 Job Address: 2029 Saruce Street Total Occupant Load: 2 Zoning R-II Type: V-N Occupancy: F-1 Nature of Work: Rev. #2: Add shower to accessible bathroom: relocate door and window Owners: Christopher English and Jean Tarascio Contractor: Dick Shiaman/Olympic Steel GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702 See Original Permits BLDOI-084 and R-1 for other inspections REQUIRED INSPECTIONS APPROVED/DATE PLUMBING -barrier free required r' ~ ~ ~~~ Shower -per attached details ~ `~~ FRAMING See permit #BLD00-089 Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 PemtitNBI.D01-1~ a GENERAL CONDIITONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-oi way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 3852294. A minimum of twenty-four hours notice is repaired. Public Works approval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-~ residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 ,r Waterman & Ketz Building 181 Qumry S Vee1 Suite 301 Pat Toumvvid, WA 98368 Phone: (360) 37¢3208 Fax: (360) 385-0675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-084R-1 Issued: 06/01/Ol Parcel Number: 985201002 Job Address: 2029 Suruce Street Zoning R-II Type: V-N Occupancy: F-1 Total Occupant Load: 2 Nature of Work: Rev #1• Revised concrete streneth of 2500 psi. No special inspection required. Owners: Christopher Enelish and Jean Tarascio Contractor: Dick Shipman/Olvmpic Steel GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • See Original Permit BLDO1-084 for other inspections. RF.OTITRF,D INSPECTIONS APPROVED/DATE FOOTINGS: See attached revised Page S-1; special inspection not required for 2500 psi concrete. SLAB FOUNDATION: See attached revised Page S-1; special inspection ~~~ r-~ /~9 ~ J ~ (~" not required for 2500 psi concrete. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page I of 2 .. Pemvlk BLDO7-084 !. GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deTiciencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildine Department's final inspection. 7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (3'743208) prior to making changes to the approved plans. ] 0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2 Walan~m R KatzBwlding 1 el Quincy Street, Suite 3DI Pal Townsend, WA 98368 Phone: (360) 379-3208 Fsz: (360) 365-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MU5T BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-0$4 Issued: 5/15101 Parcel Number: 985201002 Job Address: 2029 Spruce Street Zoning: RII Type: VV=N Occupancy: F-1 Nature of Work: Construct New 576 sg. ft. Metal Stud Building Occupant Load: 2 Owner: Christopher English/Jean Tarascio Contractor: Dick Shipman/Olympic Steel GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor and Industries @ 360-417-2702 NOTE: Special Inspection required for foundation concrete where structural design is based on greater than 2500 psi, 3, 000 psi (footings) acrd 4, 000 psi (slab and turn-dawn) this permit, per UBC Section 1701.5 Item I. Special Inspector shall be ICBO certified and listed in the current edition of WABO A enc and Ins ector Re islet or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate compliance with the plans and . specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL Erosion control measures to be installed as needed during construction FOOTINGS ,n / ~~} Setbacks -per UBC / l/~w/ 7~ 20' for exterior walls or 1-hour construction / / openings protected < 10 feet openings prohibited < 5 feet Footings Forms Reinforcement Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Petetit A BLI701 ~`~.;_ RE UIRED INSPECTIONS APPROVED/DATE SLAB FOUNDATION Forms Reinforcement Simpson Wedge Anchors Slab/Radiant - R-10 under slab - R-10 @ perimeter UFER PLUMBING -Barrier Free Design Required ~ Rough-In (D-W-V & Clean OutsO ~~~~/ p(,~ ~(~ `~~3/f~ Water Supply ` LPG Supply Pipe Insulation (R-3) Pressure Reduction Valve if pressure > 80 psi Hydronic Tubing , ~1 ~ ~ Z MECHANICAL ' Boiler/Water Heater -manufacturer's installation instructions shall be on-site at time of inspection Fresh Air -compliance with I/20 of floor area in openings Source Specific Fan @ Bathroom -terminus 3' from building openings NREC Temperature Zones Thermostat Controls perNREC 1412.1 FRAMING -All welding to be done by certified welders ~ ~/13/~/ Walls I/ t Roof Positive Connections -per engineered details Columns Fireblocking @ 10' o.c. horizontal and vertical Air Seal Windows U-factor - .90 or better NFRC window sticker must be on windows at inspection time Doors U-factor - .60 or better INSULATION / / Walls-R-11 ~/ ~G07/ Roof- R-11 GGG Vapor Barrier Required Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 .J • i RF.fITTTRF.TI TNRPF.("i'TnNS Permit q BLiNH-084 APPROVED/DATE DRYWALL/NAILING Walls I-Hr. F. R. Walls Ceiling 3DZ LIGHTING Lighting Budget -prescriptive option Daylight Zones FINAL Property Address Posted L~6 t"'U'~8 f~p~ r t~i~'L ~O/~~d Fire Department Approval -see attached memo dated 5/02/01 Electrical Approval (L & I) Insulation Certificate (if applicable) Vapor Barrier Paint Certificate (if applicable) Barrier Free Access & Design Final -Plumbing Final -Mechanical Building ~ ~'~ 0~ • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. ,~ Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Permit#BLD01-084 -.,`, 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aooroval must be received arior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4