HomeMy WebLinkAboutBLD01-083r
6
•
Waterman & Katz BuOding
181 Qnlney Stree4 Suite 301
Port Towmend~ WA 98368
Phone: 3603793208 Fax 360385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 Tor Inspection
Permit Number: $LD01-Og3 Issued: 05/11/01 Parcel Number: 948317081
Job Address: 1350 Rosecrans Zoning: R-III Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 4/2 Nature of Work: New Single-family Dwelline w/ earaee
Owner: Cavette Construction Inc Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(ITTTRFII TNCPF,C'TInNS
~_ ~ Ssva~ I ~~?~DI
~P"~ 31~z~°f('~
APPR(IVF.D/IIATF,
TEMP EROSION & SDM'T CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat per attached details
FOOTINGS
Setbacks ~ /~~0~ „n
/ ('~
/
Footings (
~
Forms
Reinforcement
Interior Footings
Porch Piers
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page i of 5
Building Pemtit #BID01 Lk3
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement ~ / (//~ r
(-/1
( 6/
Anchor Bolts w/ 2" x 2" x 3/16" square washers (
[[
Vents -14 required
Crawl Access
Beam Pockets
Alternate braced wall panel (ABWP) holdowns
@ garage door
SLAB -Non-Structural @ garage
FLOOR FRAMING
Engineered BCI plan to be on-site @ time of
j,
~~
O /
inspection ~
~
~%
Girders
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
Foundation Vents -14 required
PLUMBING:
Rough-In (D-V-T & Clean Outs) / (~ (~
~(7i(0 I p 1 1 y
"""
Water Supply !!(
\\\
Hose Bibs (backflow protection. required}
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under
Seismic Restraint - 2 places
18" A.F.F.
Pressure relief valve drain to exterior
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Building Pemilt dBLDOI-083
RE UIRED INSPECTIONS APPROVED/DATE
•
•
MECHANICAL
Electric Forced Air
/
Manufacturer'slnstallationlnstructtonstobe ~~~
~p ~~
on-site @ time of inspection
Ducts & Duct Insulation -Supply/fresh air ducts
in conditioned space: R-4; heating ducts in
unconditioned space: R-8
Whole House Ventilation
HVAC Integrated Fresh Air
7" Smooth Duct minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper requires letter
of ceRification for flow rates
Source Specific Fans
Environmental Air Exhaust ducting (with
backdraft damper), insulation (R-4) and terminus
(located 3' from opening)
FRAMING
Walls „ ~
{
~//
7~~ //~f /
Alternate Braced Wall Panel ~
//
/
E~
Roof- Engineered truss plan to be on-site at
time of inspection
Attic Venting -ridge & eave
Ceilings
Posts, beams & headers
Windows -egress
Windows -safety glazing (SGD)
Windows Ufactor - .40 or better
NFRC window sticker must be on
Windows, skylights & doors at inspection time
Air Seal
Skylights - .58 or better
Doors Ufactor - .20 or better
Truss Positive Connection
Weather Resistive Barrier
INSULATION
Floor (R-30) , A /~ ~ , / ~3~0
(~[/ I/ J
Wall (R-19 )
Ceiling (R-38 )
Baffles
Vapor Barrier: paint
Crawl space - 6 mil black poly
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 5
,,
Building Permit NBI.DOIfi83._.
REQUIRED INSPECTIONS APPROVF.nmATF.
DRY WALL NAILING
Walls
Ceiling
Gazage/House Occupancy Sepazation
Interior Braced Wall Panels
('j//_~~ D
1}%/ (J 1
FINAL
Public Works Sign-Off- no occupancy allowed
prior to completion of infrastructure
House Number - 5"numbers
Plumbing
Mechanical -Ventilation Certification for
Integrated System
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 5
Building Permit #BLD01-083
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the f-field. Contact the Building
Department at 379-5086 rQ for to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5
G
•