Loading...
HomeMy WebLinkAboutBLD01-081 ~J • Waterman & Kah Building 181 Quincy SVeet Suite 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 383.7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOI-Ogl Issued: 05111/Ol Parcel Number: 985206901 Job Address: 1031 Cherry Street Zoning: R-II Type: VV^N Occupancy: RR=3 Total Occupant Load: 2 Nature of Work: Sinele-family Residential Addition Owner: GeorEe and Barbara Marseille _ Contractor: TBD -State Contractor and City Business License Required GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF(ITTTRRTI TNCPF('TTIINC APPROVED/DATE TEMP EROSION & SDM'T CONTROL Silt Fence as needed City Rights-of--way shall be kept free of dirt and debris FOOTINGS Setbacks ~// ~//~~J~ L'!~ Footings Forms Reinforcement Interior Footings UFER FOUNDATION r/_ / n/J Stem Wall ~~ 'YY~f (` // Forms { Reinforcement Anchor Bolts - 5/8" Vents - 8 required Crawl Access Beam Pockets Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~_ Building PrnnN NBLDOI-081 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Engineered Struc joist plan to be on-site @ time of inspection ,3 Girders ~ / /~ ~j Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers PLUMBING: r/ Rough-In (D-V-T & Clean Outs) ~/ /O/ Y Water Supply Gas Supply Hose Bibs (backflow protection. req'd.) Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi MECHANICAL rn r 2 ~ f n LPG Fireplace ~ ~ `6 J :/ c / Bathroom Fan l Environmental Air Exhaust ducting (with backdraft damper, insulation (R-4) and terminus (located 3' from opening) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 L Building Permit #BLD01-081 r~ L • RFl1TiTRF.T) TNSPF.CTTnNS APPROVED/DATE FRAMING ---- -- -- - Walls -Block all plywood edges ,~ ~ I ~ n~ Roof-Engineered truss plan to be on-site at ~ i I j~ """ time of inspection ~I Attic Venting -ridge & soffit Ceilings Posts, beams & headers Truss Positive Connection Windows -egress Windows.- safety glazing (SGD) Windows/Door U factor - .39 or better NFRC window sticker must be on windows & doors at inspection time Air Seal Fire Blocking Weather Resistive Barrier INSULATION ~jl ~.- ~~~>;J~-J `~ `' Floor (R-30) ~ _ ~ ~ Wall (R-21 ) Ceiling (R-38 ) Baflles Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAILING / ~ / j ~ ~! / Walls ~/J /~1 (- ~ Ceiling FINAL " ~ minimum House Numbers-5 f„ /~~ _J// Plumbing // ~/ ~'/ Insulation Certificate ` / V. B. Paint Certificate Smoke Detectors throughout existing construction per 1997 UBC; battery powered ok in existing construction Final -Building Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 4 of 4 Building Pcrtnit bBLD01Agl GENERAL CONDTITONS I 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a • minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within siz months, or if no inspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 riot to making changes to the approved plans. 10. POST THISPERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 5 of 4