HomeMy WebLinkAboutBLD01-081
~J
•
Waterman & Kah Building
181 Quincy SVeet Suite 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fax (360) 383.7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOI-Ogl Issued: 05111/Ol Parcel Number: 985206901
Job Address: 1031 Cherry Street Zoning: R-II Type: VV^N Occupancy: RR=3
Total Occupant Load: 2 Nature of Work: Sinele-family Residential Addition
Owner: GeorEe and Barbara Marseille _ Contractor: TBD -State Contractor and City Business
License Required
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(ITTTRRTI TNCPF('TTIINC
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
Silt Fence as needed
City Rights-of--way shall be kept free of dirt and debris
FOOTINGS
Setbacks ~//
~//~~J~ L'!~
Footings
Forms
Reinforcement
Interior Footings
UFER
FOUNDATION r/_ / n/J
Stem Wall ~~
'YY~f (`
//
Forms {
Reinforcement
Anchor Bolts - 5/8"
Vents - 8 required
Crawl Access
Beam Pockets
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
~_
Building PrnnN NBLDOI-081
REQUIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING
Engineered Struc joist plan to be on-site @ time of
inspection ,3
Girders ~ /
/~
~j
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING: r/
Rough-In (D-V-T & Clean Outs) ~/ /O/
Y
Water Supply
Gas Supply
Hose Bibs (backflow protection. req'd.)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
MECHANICAL rn r
2
~ f n
LPG Fireplace ~
~
`6
J :/ c /
Bathroom Fan l
Environmental Air Exhaust ducting (with
backdraft damper, insulation (R-4) and terminus
(located 3' from opening)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
L
Building Permit #BLD01-081
r~
L
•
RFl1TiTRF.T) TNSPF.CTTnNS APPROVED/DATE
FRAMING ---- -- -- -
Walls -Block all plywood edges
,~
~ I ~
n~
Roof-Engineered truss plan to be on-site at ~ i I j~
"""
time of inspection ~I
Attic Venting -ridge & soffit
Ceilings
Posts, beams & headers
Truss Positive Connection
Windows -egress
Windows.- safety glazing (SGD)
Windows/Door U factor - .39 or better
NFRC window sticker must be on
windows & doors at inspection time
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION ~jl
~.- ~~~>;J~-J
`~
`'
Floor (R-30) ~
_ ~
~
Wall (R-21 )
Ceiling (R-38 )
Baflles
Vapor Barrier: paint
Crawl space - 6 mil black poly
DRY WALL NAILING /
~ / j ~ ~!
/
Walls ~/J
/~1 (-
~
Ceiling
FINAL
"
~
minimum
House Numbers-5 f„ /~~ _J//
Plumbing //
~/ ~'/
Insulation Certificate `
/
V. B. Paint Certificate
Smoke Detectors throughout existing construction per
1997 UBC; battery powered ok in existing construction
Final -Building
Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 4 of 4
Building Pcrtnit bBLD01Agl
GENERAL CONDTITONS I
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a •
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within siz months, or if no inspeMions are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 riot to making changes to the approved plans.
10. POST THISPERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates •
1-800-424-5555
Page 5 of 4