Loading...
HomeMy WebLinkAboutBLD01-080Walnman &. Kwz Huildiug 1 B 1 Quinry Street' Suite 301 Port Tmmse~d, WA98368 PMne: (360) 379-3208 Fax: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 8 5-22 9 4 for Inspection Permit Number: BLD~I-~g~ Issued: 04/24/01 Parcel Number: 948321001 Job Address: 834 Sheridan Avenue Zoning: P-I Type: N/C Occupancy: R_3 Nature of Work: Replace sleeping room windows to provide e¢ress Owner: Jefferson General Hospital Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHtED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE J Ceiling -patch ceiling for one-hour rating Windows -escape Window U-factor:.65 or better NFRC label shall be on windows and doors at time of inspection Window Safety Glazing (if applicable) Air Seal Fire Blocking DRYWALL/NAII.ING (as applicable) Walls Ceilings INSULATION (as applicable) Fill exposed cavities Vapor Barrier Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemtit paLD07-080 Vapor Bamer Paint Certificate (if applicable) Smoke Detectors per '97 UBC Final -Building ~~~f~, ~ ENERAL CONDITION 1. Contractors working on this project are required to have s Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aunroval must be received urior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 399-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2