HomeMy WebLinkAboutBLD01-080Walnman &. Kwz Huildiug
1 B 1 Quinry Street' Suite 301
Port Tmmse~d, WA98368
PMne: (360) 379-3208 Fax: (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 3 8 5-22 9 4 for Inspection
Permit Number: BLD~I-~g~ Issued: 04/24/01 Parcel Number: 948321001
Job Address: 834 Sheridan Avenue Zoning: P-I Type: N/C
Occupancy: R_3 Nature of Work: Replace sleeping room windows to provide e¢ress
Owner: Jefferson General Hospital
Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUHtED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
J
Ceiling -patch ceiling for one-hour rating
Windows -escape
Window U-factor:.65 or better
NFRC label shall be on windows and doors at time of
inspection
Window Safety Glazing (if applicable)
Air Seal
Fire Blocking
DRYWALL/NAII.ING (as applicable)
Walls
Ceilings
INSULATION (as applicable)
Fill exposed cavities
Vapor Barrier
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemtit paLD07-080
Vapor Bamer Paint Certificate (if applicable)
Smoke Detectors per '97 UBC
Final -Building
~~~f~, ~
ENERAL CONDITION
1. Contractors working on this project are required to have s Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works aunroval must be received urior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 399-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2