Loading...
HomeMy WebLinkAboutBLD01-078 Walertnan & KaU. Building 181 Quinq Street, Suite 301 Part rownxend, WA 98368 Phone: 360J79-5086 Fax 360.385-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaIF 385-2294 for Inspection Permit Number: $LDO1-O78 Issued: 05/08/Ol Parcel Number: 985209702 Job Address: 313 P Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: NC Nature of Work: Sin21e-family Residential Addition Owner: Sheila Smith Contractor: Anthony Couto -AMC Enterprises GENERAL CONDITIONS APPLY: See last pate SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 N TE• All engineered details including holdowns, shear walls, strapping & connections require inspection prior to cover RF.(ITTTRF.T) TNCPF.('TTONC APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Rights-of--way shall be kept free of dirt and debris from construction site FOOTINGS Setbacks ~//~© /~/J J (`J/ Footings Forms Reinforcement Interior Footings Porch/Deck Piers CALL 48 hours before you dig for Utility line locates I-800-424-5555 Page 1 of 4 Building Pmnit k01-078 µ t RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION ' Stem Wall Forms / I $' Z Z/ ~ r ~ p I' Reinforcement ~ ! ~/Il Anchor Bolts & Washers - 5/8" per engineering Foundation Vents - 2 required Crawl Access Beam Pockets Engineered Holdowns FLOOR FRAMING Girders Joists - U210 hangers r n ~p~ n tQ I ~ "ll V~ (` 'j / Blocking Shield under Post l - \ n_ , , Q _ ~ Positive Connection Girder to Concrete Treated Wood to Concrete ~ l'd"W"'" ~~ ©~~ Anchor Bolts & Washers PLUMBING. Rough-In (D-V-T & Clean outs) / / /1 Water Supply ~ ~~ ©~ / /v~,lf / Water Hammer Arrestor ( ` Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi MECHANICAL Source Specific Exhaust Fans @ laundry room (SOcfm), /~ f 1G l Environmental air exhaust ducting (with backdraft y' f l dampers), insulation (R-4) and terminus (3' from openings into building) U Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ._ V C~ Building Permit #01-078 RE UIRED INSPECTIONS APPROVED/DATE FRAMING Walls / Engineered Shear Walls ~~~~ (~ Entry Window per detail 13/sheet 2 of plans; 6 x 6 HF ~ 1 posts Roof Rafter positive connection ~~ ~J~~~./f Attic venting -ridge & eave < %U/ ((~1~~ ( J Posts, beams and headers 7 Windows -escape Windows -safety glazing Window U-factor.- per schedule; see credit calculations NFRC sticker must be on windows & doors at time of inspection Air Seal Fireblocking Weather Resistive Bamer INSULATION Floor (R-30) ~/l/ ~~ Walls (R-19 ) Ceiling (R-30 vault) Vapor Barrier -paint 6 mil black poly in crawl space -seams lapped 12" DRYWALL NAILING / Walls Z~~ Q/ / Ceiling / ~i%Y2~ ~ 2 ~ FINAL House Numbers - 5" numbers. Plumbing MechanicaUHeating Vapor Bamer Paint Certificate Smoke Detectors Final -building ~L Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 y Building Pemtit #0(A78 ~'~.. GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shalt be installed on-site and inspected prior to beginning. construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shal- be kepi free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours''notice is required. Public. Works approval must. be received prior to scheduling the Building Department's final inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if na progress has been made within six months, or if no inspections are done by the. Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-sop-x24-ssss Page 4 of 4