HomeMy WebLinkAboutBLD01-077Watenem & Katz Building
I81 Quinry 34eet, Suite 301
Port Tawmeed, WA 98366
Phone: (360)379-3206 Fu:(360)379-6923
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Call 385-2294 for Inspection
Permit Number: BLDO1-O77R-2 Issued: 3117/03 Parcel Number: 951902904
Job Address: 4777 Willamette Street Zoning: R-I
Nature of Work: Construct Garase with attached Carport each side
Owner: Steve & Amv Wilfone
GENERAL CONDITIONS APPLY -SEE LAST PAGE
EROSION & SEDIMENT
CONTROL
See General Condition No 2
FOOTING - @ carports
Setbacks
Post Footings -see carport handout, attached
Forms
Reinforcement
Positive Connection/PostBase
SLAB
Monolithic Slab Foundation
Forms
Reinforcement
FRAMING
Walls
Treated Wood to Concrete
Positive Connection post-to-beam
Ledger/Nailing
Beams
Ceiling/Roof
Rafter Positive Connection
Blocking
Weather Resistive Barrier
Type: VV=N Occupancy: U-1
Contractor: Same as Owner
d ~i~- ( 3-3 l - 03
0,~~7 3-31~~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
rama a atnoo-ozix-a
FINAL
Final -Building (refer to permit #BLD00-021 for house
construction
~,~~~ 6/a~~~3
,/In i'
GENERAL CONDITIONS
1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils ezposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by require
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works auuroval must be received prior to
scheduline the BuildinE Department's final inspection.
Final InspeMions are required prior to occupancy. A Certificate of Occupancy is required fors non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the Feld. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
~!
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
W+term®R ICa~Building
181 Quinry Scat 3~rile 301
Poet rowvamd, WA 96368
Phme (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO1-077R-1 Issued: Ol/15/02 Parcel Number: 951-902-904
lob Address: 4777 Willamette Street Zoning: R-I Type: V=N Occupancy: R 3/U-1
Total Occupant Load:N/C
Nature of Work: Revision.#1_add full bath in basement, and modify window schedule.
Owner: Steve Wilfona Contractor: Same as Owner lssv~n T L.O Zl?,O/o /
GENERAL CONDTl'IONS APPLY -SEE LAST PAGE ~CPi,CttS plZ/~O Z
SEPARATE PERMITS REOUII2ED: 7'(~ p ~X,T~O~Ij ~Z1rOL
Electrical -Contact Labor & Industries @ 360-417-2702
~xp~,ee~ 1/x103
~Cee original permit BLDOl-077 for other inspections.
RF,nTTTRF.n TN~PF,CTTnNS APPROVED/DATE
PLUMBING
Rough-In (D-V-T & Clean Outs)
Water Supply
Pipe Insulation (R-3)
MECHANICAL
Source Specific Fans
Environmental Air Exhaust ducting (with
backdraft dampers), insulation (R 4) and
terminus (located 3' .from openings)
FRAMING
Windows -Safety Glazing (if applicable)
Window Ufactor - .60 or better required
NFRC window sticker must be on
windows and skylights at inspection time
Skylight Ufactor - .68 or better required)
Air Seal
Fire Blocking
I
page 1 of 2
Permit # BLD01-0T~R-1
REQUIRED INSPECTIONS
APPROVED/DATE
INSULATION
Fill Exposed Cavities
DRYWALL
Walls
Ceiling
Vapor Barrier required on warm walls (if
applicable to scope of work)
FINAL -see original inspection record ~~ n ,~ /
.Z 7
_ .NF. A ONDITION,C
1. Contractors working on this project are required to have a Labor & Industries caMractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca113852294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
sgheduling the Building Depardnent's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential proje~k.
8. All bu~7ding permits expire if no progress has been made within su months, or if no inspections are done
by the Bw7ding Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to rocking ch~nges.~ the field. Contact the Building
Department (379-3208) prior to malting changes to the approved plans.
I o. PosT THIS PERMIT o1v-srTE yyjTH T)~,~ pPROVED PLANS.
Page 2 of t -
wnt<rtnan & Katz aui wing
781 Quinry Shell Suite 301
Port Tows tend, WA 98368
Phone (360) 379-3208 Fu (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 385-2 2 94 for Inspection
Permit Number: BLD01-077 Issued: 5/Ol/Ol Parcel Number: 951-902-904
Job Address: 4777 Willamette Street Zoning: R-I Type: VV=N Occupancy: R-3/U-1
Total Occupant Load:10/2 Nature of Work: Construct sinele-family residence with EaraQe
Owner: Steve WilfonE Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
~~s/Q f
Footings
Forms
Reinforcement
Interior Footings - 2" x 2 " x 8" w/ (2) #4 each way
Porch/Deck Piers
E
FOUNDAT N
~~
L
Stem Wall L/
~
Forms 111
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" washers
Waterproofing
S
Page 1 of 4
a acme-on
RE UIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
Beams
Joists -Engineered BCI plan shall be on-site at time
of inspection
Blocking
Positive Connections
Interior Braced Wall Supports
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
PLUMBING:
Rough-In (D-V-T & Clean outs) /~
3~ D q
Gas Supply G---~ /
/
_
Water Supply ~ ,~pL ~ n ~ ~ ~rl, e +~
Water Hammer Arresters h.,~~.-,'~ ut ho:rsz rnt~~~,„ (~jt
Hose Bibs (backflow protection required) ~"a ~ ~~ i ~1- i L.~ v 1
Pie su - -
Pressure Reduction Valve if> 80 psi
"Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminal
6" - 24" above ground
MECHANICAL -
Electric Forced Air
~ ~
~p
v M
/ ~/
Manufacturers' Installation Instructions to be on- (
/ ww
site at time of inspection
Ducts and Duct Insulation -Supply/fresh air ducts in
conditioned space: R-4; heating ducts in
unconditioned space: R-8
Whole House Ventilation -laundry room
Source Specific Fans
Environmental Air Exhaust ducting, (w/ backdraR
dampers), insulation (R-4) and terminus (located 3'
from opening)
Page 2 of 4
Pexroit#BLTJUS-077
•
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls /]~
~~~~~Q~ /I/
Ceilings "l
Roof -engineered truss plan shall be on-site at time
of inspection
Truss Positive Connection
Attic Venting - eave and ridge
Windows -escape
Window safety glazing , ~U
Windows Ufactor - :~ror better
NFRC window sticker must be on windows
and doors at inspection time
Air Seal
Fresh Air Intake (Window Ports)
Doors U-Factor - .40 or better
Fire Blocking
Weather Resistive Bamer
INSULATION A~/ ~ , /
~ CO 5 ~1
~
Floor (R-25) , (/ ~
Walls (R_l9)
Ceiling (R=38 )
Baffles
Vapor Barrier: paint
DRY WALL NAII,ING
wau5
!Ol/(~0
Ceiling
Interior Braced Wall Panels
Enclosed Usable Space under Stairs
Garage/House Occupancy Separation
FINAL
Public Works Sign-Off
House Numbers - 5"
bi
Pl
/
um
ng
t y' ~
MechanicaUHeating
Insulation Certificate
B
i
V
i
P
C
if
~
~
j
`
apor
arr
er
a
nt
ert
icate 1 ~
D ~
Smoke Detectors
LPG
Final -Chimney ,/~
//~ 1
Final -Building
i v
Page 3 of 4
,.
Permit H BLDOI-0T7
1. Contractors working on this project are required to have s Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construMion; caI1385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works ~
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A •
minimum of twenty-four hours notice is required. Public Works aonroval must he received nrior to
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required. for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspeMion per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Page 4 of 4