Loading...
HomeMy WebLinkAboutBLD01-077Watenem & Katz Building I81 Quinry 34eet, Suite 301 Port Tawmeed, WA 98366 Phone: (360)379-3206 Fu:(360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: BLDO1-O77R-2 Issued: 3117/03 Parcel Number: 951902904 Job Address: 4777 Willamette Street Zoning: R-I Nature of Work: Construct Garase with attached Carport each side Owner: Steve & Amv Wilfone GENERAL CONDITIONS APPLY -SEE LAST PAGE EROSION & SEDIMENT CONTROL See General Condition No 2 FOOTING - @ carports Setbacks Post Footings -see carport handout, attached Forms Reinforcement Positive Connection/PostBase SLAB Monolithic Slab Foundation Forms Reinforcement FRAMING Walls Treated Wood to Concrete Positive Connection post-to-beam Ledger/Nailing Beams Ceiling/Roof Rafter Positive Connection Blocking Weather Resistive Barrier Type: VV=N Occupancy: U-1 Contractor: Same as Owner d ~i~- ( 3-3 l - 03 0,~~7 3-31~~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 rama a atnoo-ozix-a FINAL Final -Building (refer to permit #BLD00-021 for house construction ~,~~~ 6/a~~~3 ,/In i' GENERAL CONDITIONS 1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by require inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works auuroval must be received prior to scheduline the BuildinE Department's final inspection. Final InspeMions are required prior to occupancy. A Certificate of Occupancy is required fors non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the Feld. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~! Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 W+term®R ICa~Building 181 Quinry Scat 3~rile 301 Poet rowvamd, WA 96368 Phme (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO1-077R-1 Issued: Ol/15/02 Parcel Number: 951-902-904 lob Address: 4777 Willamette Street Zoning: R-I Type: V=N Occupancy: R 3/U-1 Total Occupant Load:N/C Nature of Work: Revision.#1_add full bath in basement, and modify window schedule. Owner: Steve Wilfona Contractor: Same as Owner lssv~n T L.O Zl?,O/o / GENERAL CONDTl'IONS APPLY -SEE LAST PAGE ~CPi,CttS plZ/~O Z SEPARATE PERMITS REOUII2ED: 7'(~ p ~X,T~O~Ij ~Z1rOL Electrical -Contact Labor & Industries @ 360-417-2702 ~xp~,ee~ 1/x103 ~Cee original permit BLDOl-077 for other inspections. RF,nTTTRF.n TN~PF,CTTnNS APPROVED/DATE PLUMBING Rough-In (D-V-T & Clean Outs) Water Supply Pipe Insulation (R-3) MECHANICAL Source Specific Fans Environmental Air Exhaust ducting (with backdraft dampers), insulation (R 4) and terminus (located 3' .from openings) FRAMING Windows -Safety Glazing (if applicable) Window Ufactor - .60 or better required NFRC window sticker must be on windows and skylights at inspection time Skylight Ufactor - .68 or better required) Air Seal Fire Blocking I page 1 of 2 Permit # BLD01-0T~R-1 REQUIRED INSPECTIONS APPROVED/DATE INSULATION Fill Exposed Cavities DRYWALL Walls Ceiling Vapor Barrier required on warm walls (if applicable to scope of work) FINAL -see original inspection record ~~ n ,~ / .Z 7 _ .NF. A ONDITION,C 1. Contractors working on this project are required to have a Labor & Industries caMractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca113852294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to sgheduling the Building Depardnent's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential proje~k. 8. All bu~7ding permits expire if no progress has been made within su months, or if no inspections are done by the Bw7ding Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to rocking ch~nges.~ the field. Contact the Building Department (379-3208) prior to malting changes to the approved plans. I o. PosT THIS PERMIT o1v-srTE yyjTH T)~,~ pPROVED PLANS. Page 2 of t - wnt<rtnan & Katz aui wing 781 Quinry Shell Suite 301 Port Tows tend, WA 98368 Phone (360) 379-3208 Fu (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 385-2 2 94 for Inspection Permit Number: BLD01-077 Issued: 5/Ol/Ol Parcel Number: 951-902-904 Job Address: 4777 Willamette Street Zoning: R-I Type: VV=N Occupancy: R-3/U-1 Total Occupant Load:10/2 Nature of Work: Construct sinele-family residence with EaraQe Owner: Steve WilfonE Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~~s/Q f Footings Forms Reinforcement Interior Footings - 2" x 2 " x 8" w/ (2) #4 each way Porch/Deck Piers E FOUNDAT N ~~ L Stem Wall L/ ~ Forms 111 Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" washers Waterproofing S Page 1 of 4 a acme-on RE UIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Beams Joists -Engineered BCI plan shall be on-site at time of inspection Blocking Positive Connections Interior Braced Wall Supports Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers PLUMBING: Rough-In (D-V-T & Clean outs) /~ 3~ D q Gas Supply G---~ / / _ Water Supply ~ ,~pL ~ n ~ ~ ~rl, e +~ Water Hammer Arresters h.,~~.-,'~ ut ho:rsz rnt~~~,„ (~jt Hose Bibs (backflow protection required) ~"a ~ ~~ i ~1- i L.~ v 1 Pie su - - Pressure Reduction Valve if> 80 psi "Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminal 6" - 24" above ground MECHANICAL - Electric Forced Air ~ ~ ~p v M / ~/ Manufacturers' Installation Instructions to be on- ( / ww site at time of inspection Ducts and Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation -laundry room Source Specific Fans Environmental Air Exhaust ducting, (w/ backdraR dampers), insulation (R-4) and terminus (located 3' from opening) Page 2 of 4 Pexroit#BLTJUS-077 • REQUIRED INSPECTIONS APPROVED/DATE FRAMING Walls /]~ ~~~~~Q~ /I/ Ceilings "l Roof -engineered truss plan shall be on-site at time of inspection Truss Positive Connection Attic Venting - eave and ridge Windows -escape Window safety glazing , ~U Windows Ufactor - :~ror better NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .40 or better Fire Blocking Weather Resistive Bamer INSULATION A~/ ~ , / ~ CO 5 ~1 ~ Floor (R-25) , (/ ~ Walls (R_l9) Ceiling (R=38 ) Baffles Vapor Barrier: paint DRY WALL NAII,ING wau5 !Ol/(~0 Ceiling Interior Braced Wall Panels Enclosed Usable Space under Stairs Garage/House Occupancy Separation FINAL Public Works Sign-Off House Numbers - 5" bi Pl / um ng t y' ~ MechanicaUHeating Insulation Certificate B i V i P C if ~ ~ j ` apor arr er a nt ert icate 1 ~ D ~ Smoke Detectors LPG Final -Chimney ,/~ //~ 1 Final -Building i v Page 3 of 4 ,. Permit H BLDOI-0T7 1. Contractors working on this project are required to have s Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construMion; caI1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works ~ requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A • minimum of twenty-four hours notice is required. Public Works aonroval must he received nrior to 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required. for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Page 4 of 4