Loading...
HomeMy WebLinkAboutBLD01-074Waletman & Katz 181 Quinry Strew Suite 301 Pat 7owreend• WA 98368 PnaK <360) 379.3zos Fex (360) ass-ems CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Ca11385-2294 for Inspection Permit Number: BLD~1-~74 Job Address: 925 Rose Street Total Occupant Load: No Chance Owner: Claude & Barbara Bourdin Issued: 04/18/01 Parcel Number: 984901103 Zoning: R-II Type: VV=N Occupancy: R-3 Nature of Work: Construct covered aorch and deck Contractor: Owner GENERAL CONDiTTONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE FOOTINGS Setbacks Porch & Deck Footings Reinforcement FLOOR FRAMING Girders Joists Blocking Shield under Posts Positive Connections Treated Wood to Concrete FRAMING NOTE: All framing members exposed to weather to be pressure treated wood or of natural resistance to decay Posts & Beams Ledger Rafters Hangers Positive Connections Blocking Roof Surface Safety Glazing Guardrails INAL House Numbers posted (min. 5") Smoke Detectors throughout existing construction per 1997 UBC; battery powered okay Porch- Final Deck -Final _ /~~Q~ C /f ~/ ~~/~' Ca1148 hours before you dig for utility line locates: 1-800-424-5555 Page 1 of 2 Pamil#BLD01-074 GENERAL CONDITIONS I. ContraMors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license: Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris.. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible-for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works ~~ requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aauroval must be received arior to scheduling the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates: 1-800-424-5555 Page 2 of 2