Loading...
HomeMy WebLinkAboutBLD01-072Waterman & Katz Building I BI Quincy Stleet, Sui[e 301 Pat Towrumd, WA 98368 Phase: (360) 3N-3208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 Tor Inspection Permit Number: BLDOI-0728-2 Issued: 10-25-01 Parcel Number: 948-321-701 Job Address: 732 Gise Street Zoning: RR=H Type: VV=N Occupancy: R-3 Total Occupant Load:NA Nature of Work: Construct eneineered retainine wall for uarkin¢ Owner: Loren Robison Contractor: Loren Robison GENERAL CONDTITONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor. & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Install as needed to prevent dirt and debris from being tracked into City rights-of--way FOOTINGS Setbacks Footings Forms Reinforcement RETAINING WALL Stem Wall Forms Reinforcement FINAL Final -Building / ~/ ro/ ~I L Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 1 of 2 Pem~it k sLD04072R-2 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control ('I'ESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, pla~rtings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all de5ciencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection an your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduline the Buildine DeoartmenYs final. inspection. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Cs-Il 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 wetennxn ~ xaz: snila;~ 181 Quinry Sheet, Suile 307 Port 7mmsern{ WA 98368 Phone: (360) 379-3208 Fu: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-O72R-1 Issued: 06-OS-OI Parcel Number: 948-321-701 Job Address: 732 Gise Street Total Occupant Load:2 Owner: Loren Robison Zoning: RR=II Type: VV=N Occupancy: R-3 Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHtED: `Electrical -Contact Labor & Industries @ 360-417-2702 See Original Permit BLDOl-072 for other inspections. REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Engineered Holdowns @ kitchen/living room wall FRAMING Walls -''/z" sheeting with 8d's @ 6" o.c. all exterior walls Windows -escape Window safety glazing Windows Ufactor - .60 or better NFRC window sticker must be on windows and doors at inspection time ~ For all 6 ft. windows or larger minimum 6 ft. by 8 ft. DF#2 Header required per engineering Engineered nailing at garage heater- 8d's @ 3" o.c. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 add four (4) Simason HTT22 holdowns to south side as shown on revised clans and engineering: alternate hallway design will be used. Permit k BLD01-072R-1 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass ling! inspection on your project anti{ Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenri-four hours notice is required. Public Works approval must be received prior_to scheduling the Building Departments final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Wale~man &. Katz Building 181 Quinry Street, Suite 301 Pal Tonasend, WA 98368 Phme' (360) 379-3208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO1-O72 Issued: OS-10-O1 Parcel Number: 948-321-701 Job Address: 732 Gise Street Zoning: RR=H Type: VV=N Occupancy: R-3 Total Occupant Load:2 Nature of Work: Construct detached ADU accessory to 730 Gise Street Owner: Loren Robison Contractor: Loren Robison GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.(ITTTRRTI TNCPF.(`TTIINS APPRnVF.D/DATE TEMP EROSION & SEDIMENT CONTROL Silt Fence as needed I Drive OffMat to restrict sediment from leaving the site FOOTINGS Setbacks -// n~ /Z5~/~~ (~/ Footings l Forms Reinforcement FOUNDATION Stem Wall ~~~~~ Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" washers Engineered Holdowns @ garage door opening Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit A BLDOt-072 RE UIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Joists Blocking Positive Connections Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers PLUMBING: Rou h-In (D-V-T & Clean outs) / ~! b ~/~/6~ R d l ~ g M- , /U~L ( Q i/1(l ~ Water Supply Water Hammer Arrestor at clothes and dishwasher Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (minimum R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL LPG Stove -manufacturer's installation instructions shall be on-site at time of inspection Whole House Fan -Laundry Source Specific Fans Environmental Air Exhaust ducting (w/back draft dampers), insulation (min. R-4) and terminus (located 3' from opening) FRAMING Walls Q u Ceilings 26~ (~ Roof Truss Positive Connection ~/ ] ~ ~ /O ~ Attic Venting - Q ridge & eave D/ Windows -escape Window safety glazing Windows Ufactor - .60 or better NFRC window sticker must be on windows and doors at inspection time Air Seal r s 'r Intake (Window Ports ire oc ng Weather Resistive Bamer Ca1148 hours before you dig Tor utility tine locates 1-800-424-5555 Page 2 of 4 /y RE UIRED INSPECTIONS Pemti[ N BLn07-072 APPROVED/DATE INSULATION j Floor (R-19 Walls (R=19) Ceiling (R_30) Baffles Vapor Bamer: backed batts and poly ~p / /~ /~L/~C1-~~i~/ /:J //c"J /'~ y ~if ~ ~~ 1,~,~ ~ ~""` "~ ~//`~/~~ ~, J~ DRY WALL NAILING Walls ~ ~ ~l `/~/ ('.'~'' ~ ~~ ~i _~ Ceiling ~ Garage/House Occupancy Separation FINAL ~ House Numbers - 5" Plumbing MechanicallHeating LpG ~ ~7`~I / // 7, 6 "`---"'GGG Insulation Certificate Smoke Detectors Final -Building 1 ~~2 0l~ ~~ 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shal- be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shat{ be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 1 Permit#BLDO)-0r1 i 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. i Call 48 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4