Loading...
HomeMy WebLinkAboutBLD01-070Waterman & Katz Bwlding I81 Qrinry Skeet, Swte 307 Port Towrsserd, W A 98368 PMnm (360) 379-3208 Fax: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD~1-~7~ Job Address: 1250 12°i Street Total Occupant Load: 4/2 Owner: Jim Carlson Issued: 4/20/01 Parcel Number: 948310202 Zoning: RR=1I Type: VV=N Occupancy: R-3/U-1 Nature of Work: Construct single-family residence with aarase Contractor: Same as Owner GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REOIJIRED INSPECTIONS r L APPROVED/DATF, TEMP EROSION & SDM'T CONTROL .iee General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS ~ Setbacks ~ ~ // ~ '~ / Footings Forms Reinforcement Interior Footings Porch Bay Piers ~ ~' Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of ~ REOUIItED INSPECTIONS APPROVF.n/DATF, Permit k OIA70 FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" washers Alternate Braced Wall Panel Holdown Hardware @ garage end walls Vents - 13 required Crawl Access FLOOR FRAMING Engineered BCI plan to be on-site at time c yZ7~©'~ of inspection ' 6 l Girders Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers Foundation Vents - 13 required. Crawl Space Access PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply ~//~~©~ Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places R-10 under 18" A.F.F. Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan -Utility Room ~//-~ ~(/n ~ J ~/ ~~ / '~ Source Specific Fans vl1 Enwonmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page2of4 Pemdl d OI-070 1 RE UIRED INSPECTIONS APPROVED/DATE RAMING Walls Alternate Braced Wall Panels @ garage ,`s/l ~~~ "` Ceilings ` ~~~ Roof Rafter/I'russ Pos. Conn. Attic Venting -ridge & eave Windows -escape Windows Ufactor - .40 max. NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .20 max. Fire Blocking Weather Resistive Barrier INSULATION Floor (R_30) ~~ ~~~ Walls (R-19) Ceiling (R-38 ) aflles apor Barrier: paint Crawl space - 6 mil black po]y DRY WALL NAILING Walls S/~j~/® J Ceiling Interior Braced Wall Panels ~ Garage/House Occupancy Separation FINAL Public Works Sign-Off House Numbers Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building P ~ Ol (~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Pemtit # OI-WO _ AF.N .RA . CONDI170NS 1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11 3 85-2 294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4