HomeMy WebLinkAboutBLD01-069T
Watmnen & Katz BWIdWg
18] Quinry S4ee1, Swfe 301
Pal Toumxnd, WA98368
Phone: (360) 379-3208 Fax: (360) 365-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 Tor Inspection
Permit Number: BLDO1-O69 Issued: 03/15/Ol Parcel Number: 948003710
Job Address: 1129 Corona Zoning: RR=II Type: VV=N Occupancy: R_3
Nature of Work: SFR Kitchen Remodel
Owner: James and Shannon Grewell Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTI'S REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF,nT1TRF,T) TNSPECTTONS
APPROVED/DATE
PLUMBING
Rough-In (D-V-T & Clean Outs)
~/~/~
Water Supply l
'Water Hammer Arrestor @ dishwasher
Pipe Insulation (R-3)
Pressure Reduction Valve if pressure > 80 psi
MECHANICAL
Source Specific Fans / n /~
~/ ZJ'~~
/
/
/
~
Environmental Air Exhaust ducting (with backdraft (
~
/
(((
l
dampers), insulation (R-4), and terminus (located 3' from
openings into building)
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 3
-T
Permit NBLI701-069
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls
Ceiling
Window & French Door U-factor:.40 or better i//q /~
!( /ma
/
NFRC label shall be on windows and door at time of r
inspection
Window Safety Glazing
Air Seal
Fire Blocking
DRYWALL/NAILING (as applicable).
Walls
Ceilings
INSULATION
Fill exposed cavities
' 'J / r ,~ I
`/`PI ~ r l(/t
J/
Vapor Barrier Req
d: 4 mil poly, vapor barrier paint, or I
faced batts
FINAL
House Numbers -check for 5" numbers
Final -Plumbing
Final _ Mechanical
Insulation Certificate (if applicable)
Vapor Barrier Paint Certificate (if applicable)
Smoke Detectors in existing construction per '97 UBC
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
r
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
Pemtit kBLDOI-069
.3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Rrinspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected, For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility Line locates
1-800-424-5555
Page 3 of 3