CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDO1-067 Issued: 04/16/01 Parcel Number: 001024005
Job Address: 809 Tvler Street Zoning: RR=II Type: VV=N Occupancy: R-3
Total Occupant Load: No Chanee
Owner: Kurt and Marv Kippenhan
GENERAL CONDITIONS APPLY -SEE LAST PAGE
•
•
RF.niTiRF.TI TNCPF.C"TinNS
Contractor: Owner
APPRnVF,11/DATF.
FRAMING
F
' ~
NOTE: AI! framing members exposed to weather to be ' / ,.
'
pressure treated, wood of natural resistance to decay ar
treated with Woodlife Class II/Kop Koat preservative
Setbacks
Posts & Beams
Ledger
Pressure Treated Blocks
Joists
Hangers
Positive Connections
Blocking
Roof Surface
Guardrails
INAL
House Numbers posted (min. 5'~ ~
~ ~~ ~ ~ l/
J
~
//
Smoke Detectors throughout existing construction per 1997 ~
l
~l
l
UBC; battery powered okay
Porch- Final
Nature of Work: Construct covered uorch with deck surface roof
Ca1148 hours before you dig for utility liue locates:
i-800-424-5555
Page i of 2
Permit 8 HLDDI-067
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-o(--way shall be kept free of dirt
debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-fourhours notice is required. Public Works auproval must be received prior to
scheduling the Building Deuartment's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All buihiing permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changesto the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.