HomeMy WebLinkAboutBLD01-062
Waterman &. Katz Building
7 B I Quinry StreM, Suile 307
Pat Townsend WA 96368
Phone_(360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
PermitNumber: BLD~1-062R-1
Job Address: 1840 36th Street Zoning: RR=II
Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: No chance Nature of Work: Revision #1: chanties to loft space above tiaratie -
make space electrically heated, wall heitiht to 7 feet, framinti to 2 x 6, chantie in dormer windows. See
attached Seatember 21, 2001 letter and calculations from entiineer. Bathroom also to be heated.
Owner: Francis Natali
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
See original permit BLDOl-062 for other inspections.
REQUIRED INSPECTIONS
APPROVED/DATE
FOUNDATION
Anchor Bolts @ 32" o.c. w/ 2" x 2" x 3/16" square
washers -two per wall segment for bathroom
walls
FRAMING: p
~ „/J
2 x 6 Watls /2 ~~~
L (~
Window UFactor - .40 or better
Door UFactor - .20 or better
INSUL
b perimeter (R-I O @ bath
Wal s -1
Ceiling (R-30)
O_K ~ G ,
/~/ ,S" ,`~
/`"
Floor (R-30) @ loft floor /
FINAL ~ n 0
7
See on final ermit
G
Issued: 09/27/01 Parcel Number: 965400302
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
.~ ~. ,
Pem~k # BLDDI-062Rd
GENERAL CONDTTIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulin¢ the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a no~
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility liue locates
I-800-424-5555
Page 2 of Z
r
Wwlmnwn A Katz Building
181 Quinry Slree4 State 301
Port Twwnaewd. WA 98366
Phone: 360J79J208 Fos 360JBS7678
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-O62 Issued: 6104101 Parcel Number: 965400302
Job Address: 1840 36th Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 412 Nature of Work: Addition of Detached GaraEe with (R-31 Storaee Loft
Owner: Francis Natali
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
RFnTJTRF,D INSPF,CTTONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Graveled driveway for construction entrance to
prevent soil from being tracked onto City rights-
of-way
See General Condition Number 2
FOOTINGS ~
Setbacks ~~
~
Footings
Forms
Reinforcement
UFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Engineered Holdowns
Anchor Bolts @ 32" o.c. w/ 2" x 2" x 3/16" square
washers
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Pemut # BLD01-062
RE UIRED INSPECTIONS APPROVED/DATE
SLAB
Setbacks
1 j
</
Forms ~
0 I I
Reinforcement
Interior Footing
Insulation
s @ 32" o.c. with B. P. washers
olt
r B
n^
n
l_J'
Y `~"
FLOOR FRAMING
Joists
Blocking
Shield under Posts
Positive Connection
Treated Wood to Concrete
PLUMBING:
Rough-In (D-V-T & Clean Outs) Gp,,,,
~/ r /b1
~~
Fit/
Water Supply ( i
Hose Bibs (backflow protection required)
Pipe Insulation
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
R-10 under if electric
Pressure relief valve drain to exterior
MECHANICAL
Source Specific Fan
~ ~ ~ ~) ~' (' y
`"
Environmental Air Exhaust ducting, insulation l
~
and terminus (located 3' from opening)
FRAMING:
Walls
~ l ~71~~
Engineered Shear Walls -block all panel edges 111 U
Ceilings 1
1~ b\
O.C. - ~~j fe , ~~
Roof 1
11
Rafter Positive Connection
Attic Venting -ridge and soffit
Posts, beams & headers
Air Seal
Door UFactor - .20 or better (electric)/.40 or
better (other fuels)
Fire Blocking
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 4
t
Pemtit # BI.D01-062
RFf1TTTRT%Tl TNfiPF.f TTf1NC APPR(7VF,D/nATF.
•
INSULATION
lab enmeter (R-10)
Wall (R-19)
Ceiling (R-38) k `1 ~~S~O
~~ ~ ~~
Baffles
Vapor Barrier: Paint
DRY WALL NAILING ~
Walls
~..
Ceiling
Garage/Storage Occupancy Separation
r,,
.. '
FINAL
Rouse Number -check for 5" numbers
Plumbing
Mechanical
Insulation Certificate (if applicable)
Vapor Barrier Paint Certificate
Deck/Stairs
Final -Building ~~/Q/~Z
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Pemtit # HLDOI-062 '
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required Public Works auaroval must be received prior to
scheduling the Building Department's final inspection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. -All building permits expire if no progress has been made within six months, ar if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4