HomeMy WebLinkAboutBLD01-060Waterman&Katz Huildmg
181 Quincy Sveet Suite 30 t
Port Townsend, WA98368
(Phone) 379-3208 (Fax) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 3 85-22 9 4 for Inspection
Permit Number: BLD~1-Q6~
Job Address: 414 Kearney Street
Issued: 3/Z7/Oi Parcel Number: 969907601
Zoning:. CII Type: N/C Occupancy: N1C
Total Occupant Load: N!C Nature of Work: Install Tvne I Kitchen Hood with Make-ua
Air Unit and Exhaust Fan
Owner: Bill Snerry Tenant:. Food Co-on Contractor: Northern Heating & Sheetmetal
(360j 374-4090 on-site (360) 379-3307 (360) 379-9464
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
Building Permit-Required for Type 1 Hood fire suppression system.
Plumbing Pemut-Required for installation. of grease trap.
MECHANICAL
Appliance/Exhaust Interlock
Exhaust Outlet Clearance - 2' above roof,• 5' other
Type I Duct Gage
Duct JQints/Seams - contimrous liquid-tight weld
Grease Duct Supports = no penetration of duct walls
Duct Slope- %.:12
Duct/EnclosureSeparation-3"min.; 12"rnax
Duct Enclosure/Shaft -one-hour construction
Cleanouts
Air Velocity -1500fpm - 2500 fpm
Duct/Combustible Clearance -18' ; 3 "from noncombustibles
Hood Flashing -less than 12 "from ceiling or walls requires
flashing with 22 gage steel
Duct Insulation -Make-up air: R-3.3
Grease Filters -see UMC 508.5 and notes on plans
Canopy Hood -installed per ma7rufacturer's installation
JnStruCt70J]S
Page 1 of 2
Building Permit #ALDOI-060
REOUiRED INSPECTIONS
a npu nvFnm s T~
DRYWALL NAILING
Walls
Ceiling
1-hour shaft for Type 1 Hood.
FINAL
Fire Department
Electrical (I.&I)
Ptumbing -separate permit for grease trap
Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. SoiLc>
shall be permanently stabilized with seeding, phmtings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
--- 5 Re-inspeMion is required after inspection report corrections are completed.
6. The Buflding Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection cal1385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within sig months, or if no inspections are done
by the Building. Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the 3aildiu~.
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Page 2 of 2