Loading...
HomeMy WebLinkAboutBLD01-060Waterman&Katz Huildmg 181 Quincy Sveet Suite 30 t Port Townsend, WA98368 (Phone) 379-3208 (Fax) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 9 4 for Inspection Permit Number: BLD~1-Q6~ Job Address: 414 Kearney Street Issued: 3/Z7/Oi Parcel Number: 969907601 Zoning:. CII Type: N/C Occupancy: N1C Total Occupant Load: N!C Nature of Work: Install Tvne I Kitchen Hood with Make-ua Air Unit and Exhaust Fan Owner: Bill Snerry Tenant:. Food Co-on Contractor: Northern Heating & Sheetmetal (360j 374-4090 on-site (360) 379-3307 (360) 379-9464 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUII2ED: Electrical -Contact Labor & Industries @ 360-417-2702 Building Permit-Required for Type 1 Hood fire suppression system. Plumbing Pemut-Required for installation. of grease trap. MECHANICAL Appliance/Exhaust Interlock Exhaust Outlet Clearance - 2' above roof,• 5' other Type I Duct Gage Duct JQints/Seams - contimrous liquid-tight weld Grease Duct Supports = no penetration of duct walls Duct Slope- %.:12 Duct/EnclosureSeparation-3"min.; 12"rnax Duct Enclosure/Shaft -one-hour construction Cleanouts Air Velocity -1500fpm - 2500 fpm Duct/Combustible Clearance -18' ; 3 "from noncombustibles Hood Flashing -less than 12 "from ceiling or walls requires flashing with 22 gage steel Duct Insulation -Make-up air: R-3.3 Grease Filters -see UMC 508.5 and notes on plans Canopy Hood -installed per ma7rufacturer's installation JnStruCt70J]S Page 1 of 2 Building Permit #ALDOI-060 REOUiRED INSPECTIONS a npu nvFnm s T~ DRYWALL NAILING Walls Ceiling 1-hour shaft for Type 1 Hood. FINAL Fire Department Electrical (I.&I) Ptumbing -separate permit for grease trap Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. SoiLc> shall be permanently stabilized with seeding, phmtings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. --- 5 Re-inspeMion is required after inspection report corrections are completed. 6. The Buflding Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection cal1385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within sig months, or if no inspections are done by the Building. Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the 3aildiu~. Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Page 2 of 2