HomeMy WebLinkAboutBLD01-059Walervun & Katz Building
181 Quincy street Suite 301
Port Towmend, WA98368
Phone (360) 379-3208 Fax (360) 3657675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO1-O59 Issued: 5/02/01 Parcel Number: 948-317-081
Job Address: 1789 14th Street Zoning: R-HI Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 4/3 Nature of Work: Construct sin¢le-family residence with Qara2e
Owner: Neil Cavette Contractor: Cavette Construction 385-3247
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTTTRF.TI TNCPF.C`TTnNS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive OffMat to restrict sediment from leaving
the site
FOOTINGS
~
Setbacks `~~ ~ a. `~~
~
Footings `/ -;~
Forms
Reinforcement
Interior Footings - 2 " x 2" x 8" w/ (2) #4 each way
Por iers ~,
''
E ~
J
FOUNDATION -Elevate foundation above street
drainage 12 inches plus 2 per cent per UBC Section
~~~~ ~~
,lam
1806.5.5 ~ ~
Stem Wall
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" washers
Foundation Vents -14 required
Crawl Space Access
Beam Pockets
Page 1 of 4
Permit#BLDOI-059
RE UIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
Girder
Joists -Engineered BCI plan shall be on-site at time
of inspection
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
Crawl Space Access
PLUMBING:
Rough-In (D-V-T & Clean outs) ~~~ ~
~
Water Supply ~
Water Hammer Arresters
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi .
Water Heater
R-10 under
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
18" AF.F.
MECHANICAL
Electric Forced Air ~~~
Mamrfacturers' Installation Instructions to be on-
site at time of inspection
Ducts and Duct Insulation -Supply/fresh air ducts in
conditioned space: R-4; heating ducts in
unconditioned space: R-8
Whole House Ventilation
HVAC Integrated Fresh Air
7" Smooth Duct (8" flex)
Terminal Element - 8"
Clock Timer on Furnace Fan
Other than motorized damper requires letter of
certification for flow rates
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
.~
Page 2 of 4
Permit 8 HLODI-059
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls
~ ~dI ~~~
"Ceilings ll~~ ~/
Roof -engineered truss plan shall be on-site at time
Of InspeCtlOn
Truss Positive Connection
Attic Venting - eave and ridge
Windows -escape
Window safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on windows,
skylights and doors at inspection time
Skylights - .58 or better
Air Seal
Fresh Air Intake -furnace
Doors U-Factor - .20 or better
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R=30) ~ p
7
%~~
Walls (R_l9) (
Ceiling (R-38 )
Bafrles
Vapor Barrier: paint
Crawl space - 6 mil black poly
DRY WALL NAILING
Walls
~~~,®iJ~
Ceiling ~
(•/~ ~~
Garage/House Occupancy Separation
Interior Braced Wall Panels
FINAL
Public Works Sign-Off
House Numbers - 5"
Plumbing
MechanicaUHeating
Insulation Certificate
Fresh Air Certification for Integrated System
Smoke Detectors
Final -Building
Page 3 of 4
Pmmt N HLD01-059
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received arior to
scheduling the Building Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspeMions are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Page 4 of 4